<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"><channel><title>US 422</title><link>http://www.422improvements.com/rss/rss.ashx</link><description>US 422 News and Updates</description><ttl>60</ttl><item><title>Week of Feb. 8  2010 Construction Report</title><link>http://www.422improvements.com/News/Week-of-Feb.-8--2010-Construction-Report-nwMFT_100.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Week-of-Feb.-8--2010-Construction-Report-nwMFT_100.aspx</guid><description>•	US 422 East, Upper Providence, Limerick twps. - Guide Rail Replacement: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford interchanges. 10 AM - 5 AM. - 2/8/10-2/12/10•	US 422 West, Upper Providence, Limerick twps. - Conduit Installation: LEFT LANE CLOSED between PA 29 &amp; Royersford interchanges. 7 PM - 2 PM. - 2/8/10-2/12/10•	US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 AM; WESTBOUND 7 PM - 2 PM. - 5/26/09-7/2010</description><pubDate>2/8/2010 12:00:00 AM</pubDate></item><item><title>Week of February 1  2010</title><link>http://www.422improvements.com/News/Week-of-February-1--2010-nwMFT_99.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Week-of-February-1--2010-nwMFT_99.aspx</guid><description>•	US 422 East, Trredyffrin, Upper Merion twps. - Surveying: POSSIBLE LANE CLOSURE near First Ave. Interchange. 9 AM - 3 PM. - 2/1/10•	US 422 East, Trredyffrin, Upper Merion twps. - Surveying: POSSIBLE LANE CLOSURE near First Ave. Interchange. 9 AM - 3 PM. - 2/1/10•	US 422 East, Upper Providence, Limerick twps. - Guide Rail Replacement: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford interchanges. 10 AM - 5 AM. - 2/1/10-2/5/10•	US 422 West, Upper Providence, Limerick twps. - Conduit Installation: LEFT LANE CLOSED between PA 29 &amp; Royersford interchanges. 7 PM - 2 PM. - 2/1/10-2/5/10•	US 422 E &amp; W, Upper Merion Twp. - Surveying: POSSIBLE LANE CLOSURE near PA 23 Interchange. 9 AM - 3 PM. - 2/2/10•	US 422 West, Limerick Twp. - Joint Sealing: LANE RESTRICTIONS between Royersford &amp; Limerick Exits. 9 AM - 3 PM. - 2/2/10-2/4/10•	US 422/PA 23 Interchange, Upper Merion Twp. - Surveying: POSSIBLE LANE RESTRICTION on ramps. 9 AM - 3 PM. - 2/3/10•	US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 AM; WESTBOUND 7 PM - 2 PM. - 5/26/09-7/2010</description><pubDate>2/1/2010 12:00:00 AM</pubDate></item><item><title>Week of January 25  2010 Construction Report</title><link>http://www.422improvements.com/News/Week-of-January-25--2010-Construction-Report-nwMFT_98.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Week-of-January-25--2010-Construction-Report-nwMFT_98.aspx</guid><description>•	US 422 East, Upper Providence, Limerick twps. - Guide Rail Replacement: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford interchanges. 10 AM - 5 AM. - 1/25/10-1/29/10•	US 422 West, Upper Providence, Limerick twps. - Conduit Installation: LEFT LANE CLOSED between PA 29 &amp; Royersford interchanges. 7 PM - 2 PM. - 1/25/10-1/29/10•	US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 AM; WESTBOUND 7 PM - 2 PM. - 5/26/09-7/2010</description><pubDate>1/25/2010 12:00:00 AM</pubDate></item><item><title>Week of January 18  2010 Construction Report</title><link>http://www.422improvements.com/News/Week-of-January-18--2010-Construction-Report-nwMFT_97.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Week-of-January-18--2010-Construction-Report-nwMFT_97.aspx</guid><description>•	US 422 East, Upper Providence, Limerick twps. - Guide Rail Replacement: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford interchanges. 10 AM - 5 AM. - 1/18/10-1/22/10•	US 422 West, Upper Providence, Limerick twps. - Conduit Installation: LEFT LANE CLOSED between PA 29 &amp; Royersford interchanges. 7 PM - 2 PM. - 1/18/10-1/22/10•	US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 AM; WESTBOUND 7 PM - 2 PM. - 5/26/09-7/2010</description><pubDate>1/19/2010 12:00:00 AM</pubDate></item><item><title>Week of January 11  2010 Construction Report</title><link>http://www.422improvements.com/News/Week-of-January-11--2010-Construction-Report-nwMFT_96.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Week-of-January-11--2010-Construction-Report-nwMFT_96.aspx</guid><description>•	US 422 East, Upper Providence, Limerick twps. - Guide Rail Replacement: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford interchanges. 10 AM - 5 AM. - 1/11/10-1/15/10•	US 422 West, Upper Providence, Limerick twps. - Conduit Installation: LEFT LANE CLOSED between PA 29 &amp; Royersford interchanges. 7 PM - 2 PM. - 1/11/10-1/15/10•	US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 AM; WESTBOUND 7 PM - 2 PM. - 5/26/09-7/2010</description><pubDate>1/11/2010 12:00:00 AM</pubDate></item><item><title>Week of January 4  2010 Construction Update</title><link>http://www.422improvements.com/News/Week-of-January-4--2010-Construction-Update-nwMFT_95.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Week-of-January-4--2010-Construction-Update-nwMFT_95.aspx</guid><description>•	US 422 East, Upper Providence &amp; Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. 10 AM - 5 AM. - 12/21/09-12/23/09•	US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 AM; WESTBOUND 7 PM - 2 PM. - 5/26/09-7/2010</description><pubDate>1/4/2010 12:00:00 AM</pubDate></item><item><title>Week of December 14  2009 Construction Report</title><link>http://www.422improvements.com/News/Week-of-December-14--2009-Construction-Report-nwMFT_94.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Week-of-December-14--2009-Construction-Report-nwMFT_94.aspx</guid><description>•	US 422 East, Upper Providence, Limerick twps. - Road Resurfacing: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 10 AM - 5 AM. - 11/30/09-12/4/09•	US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM. - 5/26/09-7/2010</description><pubDate>12/14/2009 12:00:00 AM</pubDate></item><item><title>Week of December 7th Construction Report</title><link>http://www.422improvements.com/News/Week-of-December-7th-Construction-Report-nwMFT_93.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Week-of-December-7th-Construction-Report-nwMFT_93.aspx</guid><description>•	US 422 East, Upper Providence, Limerick twps. - Road Resurfacing: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 10 AM - 5 AM. - 11/30/09-12/4/09•	US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM. - 5/26/09-7/2010</description><pubDate>12/7/2009 12:00:00 AM</pubDate></item><item><title>Week of November 30 Construction Report</title><link>http://www.422improvements.com/News/Week-of-November-30-Construction-Report-nwMFT_92.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Week-of-November-30-Construction-Report-nwMFT_92.aspx</guid><description>•	US 422 East, Upper Providence, Limerick twps. - Road Resurfacing: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 10 AM - 5 AM. - 11/30/09-12/4/09•	US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM. - 5/26/09-7/2010</description><pubDate>11/30/2009 12:00:00 AM</pubDate></item><item><title>Week of November 23  2009 Construction Report</title><link>http://www.422improvements.com/News/Week-of-November-23--2009-Construction-Report-nwMFT_91.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Week-of-November-23--2009-Construction-Report-nwMFT_91.aspx</guid><description>•	US 422 East, Upper Providence, Limerick twps. - Road Resurfacing: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 10 AM - 5 AM. - 11/23/09-11/24/09•	US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM. - 5/26/09-7/2010</description><pubDate>11/23/2009 12:00:00 AM</pubDate></item><item><title>Week of November 16  2009 Construction Report</title><link>http://www.422improvements.com/News/Week-of-November-16--2009-Construction-Report-nwMFT_90.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Week-of-November-16--2009-Construction-Report-nwMFT_90.aspx</guid><description>•	US 422 East, Upper Providence, Limerick twps. - Road Resurfacing: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 10 AM - 5 AM. - 11/16/09-11/20/09•	US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM. - 5/26/09-7/2010</description><pubDate>11/16/2009 12:00:00 AM</pubDate></item><item><title>WEEK of NOVEMBER 8 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-of-NOVEMBER-8-CONSTRUCTION-REPORT-nwMFT_89.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-of-NOVEMBER-8-CONSTRUCTION-REPORT-nwMFT_89.aspx</guid><description>•	US 422 East, Upper Providence, Limerick twps. - Road Resurfacing: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 10 AM - 5 AM. - 11/2/09-11/6/09•	US 422 West, Upper Providence, Limerick twps. - Road Construction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchanges. 7 PM - 2 PM. - 11/2/09-11/6/09•	US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM ; WESTBOUND WEEKENDS 7 PM - 2 PM. - 5/26/09-7/2010</description><pubDate>11/9/2009 12:00:00 AM</pubDate></item><item><title>Week of Nov 2 Construction Report</title><link>http://www.422improvements.com/News/Week-of-Nov-2-Construction-Report-nwMFT_87.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Week-of-Nov-2-Construction-Report-nwMFT_87.aspx</guid><description>•	US 422 East, Upper Providence, Limerick twps. - Road Resurfacing: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 10 AM - 5 AM. - 11/2/09-11/6/09•	US 422 West, Upper Providence, Limerick twps. - Road Construction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchanges. 7 PM - 2 PM. - 11/2/09-11/6/09•	US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM ; WESTBOUND WEEKENDS 7 PM - 2 PM. - 5/26/09-7/2010</description><pubDate>11/3/2009 12:00:00 AM</pubDate></item><item><title>US 422 Corridor Master Plan Summary Report DRAFT available for public comment</title><link>http://www.422improvements.com/News/US-422-Corridor-Master-Plan-Summary-Report-DRAFT-available-for-public-comment-nwMFT_88.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/US-422-Corridor-Master-Plan-Summary-Report-DRAFT-available-for-public-comment-nwMFT_88.aspx</guid><description>The recently released US 422 Corridor Master Plan Summary Report DRAFT is available for public comment.&#160; The report can be viewed and commented on at&#160;www.422corridor.com</description><pubDate>11/3/2009 12:00:00 AM</pubDate></item><item><title>Week of Oct 26. Construction Report</title><link>http://www.422improvements.com/News/Week-of-Oct-26.-Construction-Report-nwMFT_85.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Week-of-Oct-26.-Construction-Report-nwMFT_85.aspx</guid><description>•	US 422 E &amp; W, Lower Providence, W. Norriton, Upper Merion twps. - Pavement Marker Installation: LANE RESTRICTIONS between US 202 &amp; PA 23. 7 PM - 5 AM. - 10/19/09•	US 422 East, Upper Providence, Limerick twps. - Road Resurfacing: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 10 AM - 5 AM. - 10/19/09-10/23/09•	US 422 West, Upper Providence, Limerick twps. - Road Construction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 7 PM - 2 PM. - 10/19/09-10/23/09•	US 422 E &amp; W, Lower Providence, W. Norriton, Upper Merion twps. - Rumble Strip Installation: LANE RESTRICTIONS between US 202 &amp; PA 363. 7 PM - 5 AM. - 10/20/09-10/23/09•	US 422 East, Upper Merion Twp. - Sweeping: MOVING OPERATION ON SHOULDER between Oaks &amp; US 202. 9 AM - 3 PM. - 10/22/09•	US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM ; WESTBOUND WEEKENDS 7 PM - 2 PM. - 5/26/09-7/2010</description><pubDate>10/26/2009 12:00:00 AM</pubDate></item><item><title>New Route 252 Bridge Opens Today in Tredyffrin Township Valley Forge Road Bridge completed ahead of schedule.</title><link>http://www.422improvements.com/News/New-Route-252-Bridge-Opens-Today-in-Tredyffrin-Township-Valley-Forge-Road-Bridge-completed-ahead-of-schedule.-nwMFT_86.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/New-Route-252-Bridge-Opens-Today-in-Tredyffrin-Township-Valley-Forge-Road-Bridge-completed-ahead-of-schedule.-nwMFT_86.aspx</guid><description>KING OF PRUSSIA, PA. (OCT. 26, 2009) — The Pennsylvania Turnpike Commission announced the opening of the newly reconstructed Valley Forge Road Bridge (Route 252) today – weeks ahead of schedule.
The bridge crosses the Turnpike at milepost 324.3, 1.6 miles west of the Valley Forge Interchange (Exit #326). Allan A. Myers, a Company of American Infrastructure, was awarded the $4.8 million contract to rebuild the bridge in January with the anticipated opening in mid-November.
The new bridge features a stone architectural treatment and includes two 12-foot travel lanes and 8-foot shoulders. It will accommodate pedestrians and bicyclists who use the bridge to access Valley Forge National Park. The area adjacent to the bridge has been landscaped with two rain gardens.
The Valley Forge Road Bridge (Route 252) project was the first of nine bridges targeted for replacement as part of the Turnpike’s total reconstruction and widening project. The six-mile Turnpike mainline (I-76) traverses Tredyffrin and Upper Merion Townships. The project area begins at milepost 320 (Future Rt. 29 Slip Ramps) and continues east to milepost 326 (Valley Forge Interchange).
Please visit the Pennsylvania Turnpike website at www.paturnpike.com for project-related announcements and updates.
</description><pubDate>10/26/2009 12:00:00 AM</pubDate></item><item><title>Senator John C. Rafferty named head of State Transportation Commission</title><link>http://www.422improvements.com/News/Senator-John-C.-Rafferty-named-head-of-State-Transportation-Commission-nwMFT_84.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Senator-John-C.-Rafferty-named-head-of-State-Transportation-Commission-nwMFT_84.aspx</guid><description>HARRISBURG — Senate President Pro Tempore Joe Scarnati (R-25) has appointed Sen. John C. Rafferty Jr., (R-44) to chair the Senate Transportation Committee. He replaces former Sen. Rob Wonderling, who resigned earlier this year.
&quot;I look forward to using this new position to help improve our transportation system, which is crucial to protecting public safety and also expanding our economy,&quot; Rafferty said. &quot;Transportation issues affect every resident in Pennsylvania, whether it involves a daily commute to work or a bus ride on the public transit system or the movement of goods. Our goal is to have a modern, efficient system that meets the needs of its users.&quot;
Scarnati said Rafferty was chosen because of his knowledge of the issue and his interest in taking on new transportation challenges.
&quot;As a member of the committee, John demonstrated a broad understanding of the major issues we are facing regarding transportation, and, as chairman, I know he will work well with the members, the House and the administration to improve our vast transportation network,&quot; Scarnati said.Reported in the Pottstown Mercury on October 22, 2009</description><pubDate>10/22/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF OCTOBER 19 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-OCTOBER-19-CONSTRUCTION-REPORT-nwMFT_83.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-OCTOBER-19-CONSTRUCTION-REPORT-nwMFT_83.aspx</guid><description>•	US 422 E &amp; W, Lower Providence, W. Norriton, Upper Merion twps. - Pavement Marker Installation: LANE RESTRICTIONS between US 202 &amp; PA 23. 7 PM - 5 AM. - 10/19/09•	US 422 East, Upper Providence, Limerick twps. - Road Resurfacing: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 10 AM - 5 AM. - 10/19/09-10/23/09•	US 422 West, Upper Providence, Limerick twps. - Road Construction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 7 PM - 2 PM. - 10/19/09-10/23/09•	US 422 E &amp; W, Lower Providence, W. Norriton, Upper Merion twps. - Rumble Strip Installation: LANE RESTRICTIONS between US 202 &amp; PA 363. 7 PM - 5 AM. - 10/20/09-10/23/09•	US 422 East, Upper Merion Twp. - Sweeping: MOVING OPERATION ON SHOULDER between Oaks &amp; US 202. 9 AM - 3 PM. - 10/22/09•	US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM ; WESTBOUND WEEKENDS 7 PM - 2 PM. - 5/26/09-7/2010</description><pubDate>10/19/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF OCT 12 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-OCT-12-CONSTRUCTION-REPORT-nwMFT_81.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-OCT-12-CONSTRUCTION-REPORT-nwMFT_81.aspx</guid><description>•	US 422 E &amp; W, Lower Providence, W. Norriton, Upper Merion twps. - Road Work: LANE RESTRICTIONS between US 202 &amp; PA 23. 7 PM - 5 AM. - 10/12/09-10/14/09•	US 422 East, Upper Providence, Limerick twps. - Road Resurfacing: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 10 AM - 5 AM. - 10/12/09-10/16/09•	US 422 West, Upper Providence, Limerick twps. - Road Construction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 7 PM - 2 PM. - 10/12/09-10/16/09•	US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM ; WESTBOUND WEEKENDS 7 PM - 2 PM. - 5/26/09-7/2010</description><pubDate>10/13/2009 12:00:00 AM</pubDate></item><item><title>Lane Restrictions Scheduled On Route 29 For Cross Walk and ADA Ramp Installation</title><link>http://www.422improvements.com/News/Lane-Restrictions-Scheduled-On-Route-29-For-Cross-Walk-and-ADA-Ramp-Installation-nwMFT_82.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Lane-Restrictions-Scheduled-On-Route-29-For-Cross-Walk-and-ADA-Ramp-Installation-nwMFT_82.aspx</guid><description>King of Prussia – The Pennsylvania Department of Transportation (PennDOT) today announced lane restrictions are scheduled on Route 29 between Germantown Pike and Main Street in Collegeville Borough and Lower Providence Township, Montgomery County, on Monday through Friday (October 12-16) from 9 a.m. to 3 p.m. for crosswalk and ADA ramp installation.
The work is part of PennDOT’s project to realign and widen First Avenue (Route 29) at Main Street to accommodate longer turn lanes; widen Main Street between First Avenue (Route 29) and Second Avenue (Route 29) to add turn lanes; and widen Second Avenue (Route 29) at Main Street for additional turn lanes.  The Route 29 and Main Street junction is currently two T-intersections that are offset by 500 feet.    
In addition, the lane configuration on the Perkiomen Bridge and at the intersection of Germantown Pike and Ridge Pike is being revised to allow for new turn lanes.  Five traffic signals are also being replaced and interconnected along Route 29 to improve traffic flow and provide for better emergency responsiveness.  
In addition, streetscape amenities are being installed along Main Street at First Avenue (Route 29), including new street lights, trees, and decorative cross walks.  
Road-Con, Inc., of West Chester is the general contractor on the $3,538,747 project that is financed with 80 percent federal and 20 percent state funds.  The work is expected to finish by October 30, 2009.
PennDOT reminds motorists they can log on to 511pa.com or call 511 from any phone to check traffic conditions on major highways before heading out.
For more information, visit www.dot.state.pa.us/district6 
Source: PennDOT Engineering District 6, King of Prussia, PA</description><pubDate>10/13/2009 12:00:00 AM</pubDate></item><item><title>Oaks 422 ramp project to get federal money</title><link>http://www.422improvements.com/News/Oaks-422-ramp-project-to-get-federal-money-nwMFT_80.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Oaks-422-ramp-project-to-get-federal-money-nwMFT_80.aspx</guid><description>OAKS — U.S. sens. Robert Casey and Arlen Specter have announced funding made available for transportation projects in Pennsylvania.
In this area, $1.3 million has been made available for improvements to the Route 422 off-ramp in Oaks. The reconstruction of the westbound off-ramp is aimed at mitigating traffic congestion on 422 and Egypt Road.
Although no federal money is announced to help restore rail service between Philadelphia and Reading, a project Specter recently came out to support, the bill does include $3 million to provide commuter rail service from Scranton to New York City.
Before the money is released, however, the bill in which it is included, must go through the conference process with the House of Representatives and signed into law by the president.
Courtesy of the Pottstown Mercury 9/28/2009</description><pubDate>9/30/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF SEPT 28 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-SEPT-28-CONSTRUCTION-REPORT-nwMFT_79.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-SEPT-28-CONSTRUCTION-REPORT-nwMFT_79.aspx</guid><description>US 422 E &amp; W, Lower Providence, W. Norriton, Upper Merion twps. - Paving: LANE RESTRICTIONS between US 202 &amp; PA 23. 6 PM - 6 AM. - $5.7 millionUS 422 East, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 10 AM - 5 AM. - $12.2 millionUS 422 West, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 7 PM - 2 PM. - $12.2 millionUS 422 East, Lower Providence Twp. - Pavement Marking Installation: LANE RESTRICTIONS between Oaks Exit &amp; PA 363. 9 AM - 3 PM.US 422 East, Upper Merion Twp. - Bridge Inspection: RIGHT LANE CLOSED between Pawlings Rd. &amp; Egypt Rd. 9 AM - 3 PM.US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM ; WESTBOUND WEEKENDS 7 PM - 2 PM. - $12.2 million</description><pubDate>9/28/2009 12:00:00 AM</pubDate></item><item><title>PENNDOT  LANE RESTRICTIONS SCHEDULED ON ROUTE 202 AND ROUTE 422 FOR A SERIES OF BRIDGE INSPECTIONS IN MONTGOMERY COUNTY</title><link>http://www.422improvements.com/News/PENNDOT--LANE-RESTRICTIONS-SCHEDULED-ON-ROUTE-202-AND-ROUTE-422-FOR-A-SERIES-OF-BRIDGE-INSPECTIONS-IN-MONTGOMERY-COUNTY-nwMFT_78.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/PENNDOT--LANE-RESTRICTIONS-SCHEDULED-ON-ROUTE-202-AND-ROUTE-422-FOR-A-SERIES-OF-BRIDGE-INSPECTIONS-IN-MONTGOMERY-COUNTY-nwMFT_78.aspx</guid><description>The Pennsylvania Department of Transportation (PennDOT) today announced that lane restrictions are scheduled on Route 202 and Route 422 in Montgomery County for a series of bridge inspections.
The work schedule is:
• Tuesday (September 29) – The right shoulder on southbound Route 202 will be closed between Gulph Road and County Line Road in Upper Merion Township from 9 a.m. to 3 p.m.
• Saturday (October 3) – The right lane on eastbound Route 422 will be closed between Pawlings Road and Egypt Road in Upper Merion Township from 9 a.m. to 3 p.m.
</description><pubDate>9/25/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF SEPT. 21 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-SEPT.-21-CONSTRUCTION-REPORT-nwMFT_77.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-SEPT.-21-CONSTRUCTION-REPORT-nwMFT_77.aspx</guid><description>US 422 E &amp; W, Lower Providence, W. Norriton, Upper Merion twps. - Paving: LANE RESTRICTIONS between US 202 &amp; PA 23. 6 PM - 6 AM. - 9/21/09-9/24/09US 422 East, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 10 AM - 5 AM. - 9/21/08-9/25/09US 422 West, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 7 PM - 2 PM. - 9/21/09-9/25/09US 422 E &amp; W, Various Municipalities - Vegetation Maintenance: INTERMITTENT LANE RESTRICTIONS between US 202 &amp; PA 100. 9 AM - 3 PM. - 9/23/09-9/25/09US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM ; WESTBOUND WEEKENDS 7 PM - 2 PM. - 5/26/09-7/2010</description><pubDate>9/21/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF SEPT. 14 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-SEPT.-14-CONSTRUCTION-REPORT-nwMFT_76.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-SEPT.-14-CONSTRUCTION-REPORT-nwMFT_76.aspx</guid><description>US 422 E &amp; W, Lower Providence, W. Norriton, Upper Merion twps. - Milling: LANE RESTRICTIONS between US 202 &amp; PA 23. 6 PM - 6 AM. - 9/13/09-9/17/09US 422 East, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 10 AM - 5 AM. - 9/14/08-9/18/09US 422 West, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 7 PM - 2 PM. - 9/14/09-9/18/09US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM ; WESTBOUND WEEKENDS 7 PM - 2 PM. - 5/26/09-7/2010</description><pubDate>9/14/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF AUGUST 31 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-AUGUST-31-CONSTRUCTION-REPORT-nwMFT_75.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-AUGUST-31-CONSTRUCTION-REPORT-nwMFT_75.aspx</guid><description>US 422 East, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 10 AM - 5 AM. - 8/31/09-9/4/09US 422 West, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 7 PM - 2 PM. - 8/31/09-9/4/09US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM ; WESTBOUND WEEKENDS 7 PM - 2 PM. - 5/26/09-7/2010</description><pubDate>8/31/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF AUGUST 24 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-AUGUST-24-CONSTRUCTION-REPORT-nwMFT_74.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-AUGUST-24-CONSTRUCTION-REPORT-nwMFT_74.aspx</guid><description>US 422 East, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 10 AM - 5 AM. - 8/24/09-8/28/09US 422 West, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 7 PM - 2 PM. - 8/24/09-8/28/09US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM ; WESTBOUND WEEKENDS 7 PM - 2 PM. - 5/26/09-7/2010</description><pubDate>8/24/2009 12:00:00 AM</pubDate></item><item><title>WEEEK OF AUGUST 17 CONSTRUCTION</title><link>http://www.422improvements.com/News/WEEEK-OF-AUGUST-17-CONSTRUCTION-nwMFT_73.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEEK-OF-AUGUST-17-CONSTRUCTION-nwMFT_73.aspx</guid><description>US 422 East, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. Weekdays 10 AM - 5 AM. - 8/17/09-8/21/09US 422 West, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. Weekdays 7 PM - 2 PM. - 8/17/09-8/21/09US 422 E &amp; W, Lower Pottsgrove, Limerick twps. - Rumble Strip Installation: LANE RESTRICTIONS between Sanatoga &amp; Royersford exits. 9 AM - 3 PM. - 8/17/09-8/21/09US 422 E &amp; W, Lower Providence, Upper Providence twps. - Rumble Strip Installation: LANE RESTRICTIONS between PA 29 &amp; PA 363 exits. 9 AM - 3 PM. - 8/17/09-8/21/09US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM ; WESTBOUND WEEKENDS 7 PM - 2 PM. - 5/26/09-7/2010</description><pubDate>8/17/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF AUGUST 10 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-AUGUST-10-CONSTRUCTION-REPORT-nwMFT_72.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-AUGUST-10-CONSTRUCTION-REPORT-nwMFT_72.aspx</guid><description>US 422 West, Lower Pottsgrove, N. Coventry twps. - Bridge Work: REDUCED TWO LANES TO ONE near Armand Hammer Blvd. Interchange. 9 AM - 3 PM. - 8/10/09US 422 E &amp; W, Limerick, Upper Providence, Lower Providence, Upper Merion twps. - Line Painting: SLOW MOVING OPERATION to paint lines on state highways. MOTORISTS ADVISED TO REMAIN AMPLE DISTANCE BEHIND LINE PAINTING TRUCK AND STAY OFF TRAFFIC LINES. 7 AM - 2 PM. - 8/8/09US 422 West, Lower Pottsgrove, N. Coventry twps. - Bridge Work: REDUCED TWO LANES TO ONE near Armand Hammer Blvd. Interchange. 9 AM - 3 PM. - 8/10/09US 422 West, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 7 AM - 2 PM; 7 PM - 2 PM. - 8/10/09US 422 E &amp; W, Upper Merion Twp. - Bridge Inspection: RIGHT LANE CLOSED between Valley Forge &amp; Trooper rds. 9 AM - 3 PM. - 8/10/09-8/12/09US 422 East, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. Weekdays 10 AM - 5 AM. - 8/10/09-8/14/09US 422 West, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. Weekdays 7 PM - 2 PM. - 8/11/09-8/14/09US 422 West, Upper Providence Twp. - Bridge Inspection: RIGHT LANE CLOSED between Pawlings &amp; Egypt rds. 9 AM - 3 PM. - 8/13/09-8/15/09US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM ; WESTBOUND WEEKENDS 7 PM - 2 PM. - 5/26/09-7/2010</description><pubDate>8/10/2009 12:00:00 AM</pubDate></item><item><title>PENNDOT TO BEGIN WORK TO IMPROVE US 422 WEST BETWEEN COLLEGEVILLE AND ROYERSFORD </title><link>http://www.422improvements.com/News/PENNDOT-TO-BEGIN-WORK-TO-IMPROVE-US-422-WEST-BETWEEN-COLLEGEVILLE-AND-ROYERSFORD--nwMFT_71.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/PENNDOT-TO-BEGIN-WORK-TO-IMPROVE-US-422-WEST-BETWEEN-COLLEGEVILLE-AND-ROYERSFORD--nwMFT_71.aspx</guid><description>Construction also continues to improve eastbound US 422 under $12 million Economic Recovery Project
KING OF PRUSSIA, PA – The Pennsylvania Department of Transportation today announced that construction will start Monday (Aug. 10) to repair and resurface westbound Route 422 between the Route 29 (Collegeville) and Royersford interchanges in Upper Providence and Limerick townships, Montgomery County.  This work is part of the $12.2 million economic recovery project that began on May 26 (2009).
Crews will begin saw cutting areas of old concrete Monday (Aug. 10) and westbound Route 422 will be reduced from two lanes to one from 5 a.m. to 2 p.m., and then from 7 p.m. Monday to 2 p.m. Tuesday (Aug. 11).  After Monday, westbound Route 422 will be restricted to one lane weekdays from 7 p.m. to 2 p.m. the next afternoon for construction.   All westbound lanes will reopen before the afternoon rush hours.
Crews also will continue to replace deteriorated concrete and soon will begin resurfacing Route 422’s eastbound lanes between Royersford and Collegeville.  Eastbound Route 422 is restricted to one lane weekdays from 10 a.m. to 5 a.m. the next morning.  
PennDOT is rehabilitating and improving this deteriorated 4.5-mile section of Route 422 under a $12.2 million project that is financed by the American Recovery and Reinvestment Act (ARRA).  The project extends from 1,500 feet west of the Royersford Interchange to a half-mile
east of the Route 29 (Collegeville) Interchange in Limerick and Upper Providence townships, respectively.  Construction is scheduled to finish in July 2010.
The improvement project consists of removing deteriorated concrete pavement; pouring new concrete patches; resurfacing the concrete pavement with asphalt; repairing 12 bridges; repairing ramps at the Route 29 and Royersford interchanges; installing safety rumble strips on roadway shoulders; cleaning existing pipe culverts; and installing new guide rail, reflective pavement markers, and Intelligent Transportation System conduit.
Route 422 carries 62,000 vehicles a day between the Collegeville and Royersford exits.  This portion of the highway, which was built in the early 1970s, has four 12-foot wide travel lanes plus a 10-foot wide outside shoulder and an eight-foot wide inside shoulder.
Road-Con, Inc. of West Chester, Pa. is the general contractor on the $12,217,790 project.  Eight sub-contractors are part of the project team and are performing various operations, including paving, traffic control, line painting, concrete saw cutting, pipe cleaning, guide rail and fence installation; rumble strip installations; and seeding and erosion control.
In the five-county Philadelphia region, PennDOT is investing $255 million of federal economic recovery money on 29 state and local transportation projects that will improve roads 
and bridges, install Intelligent Transportation System equipment, upgrade traffic signals, build a multi-use trail, and bring over 3,500 handicap curb ramps up to current design standards.  
To learn more about how the federal economic recovery program will benefit Pennsylvania, visit www.recovery.pa.gov. </description><pubDate>8/6/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF AUGUST 3 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-AUGUST-3-CONSTRUCTION-REPORT-nwMFT_70.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-AUGUST-3-CONSTRUCTION-REPORT-nwMFT_70.aspx</guid><description>US 422 E &amp; W, Lower Providence Twp. - Drain Cleaning: RIGHT LANE CLOSED between Trooper Rd. &amp; Valley Forge Rd. 9:30 AM - 2:30 PM. - 8/3/09-8/6/09US 422 East, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. Weekdays 10 AM - 5 AM. - 8/3/09-8/7/09US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM ; WESTBOUND WEEKENDS 7 PM - 2 PM. (Westbound restrictions starting in late summer.) - 5/26/09-7/2010</description><pubDate>8/3/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF JULY 20 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-JULY-20-CONSTRUCTION-REPORT-nwMFT_69.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-JULY-20-CONSTRUCTION-REPORT-nwMFT_69.aspx</guid><description>US 422 East, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. Weekdays 10 AM - 5 AM. - 7/20/09-7/24/09US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM ; WESTBOUND WEEKENDS 7 PM - 2 PM. (Westbound restrictions starting in late summer.) - 5/26/09-7/2010</description><pubDate>7/20/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF JULY 6 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-JULY-6-CONSTRUCTION-REPORT-nwMFT_68.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-JULY-6-CONSTRUCTION-REPORT-nwMFT_68.aspx</guid><description>US 422 East, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. Weekdays 10 AM - 5 AM. - 7/6/09-7/10/09US 422 West, Upper Merion, West Norriton twps. - Bridge Construction: LANE RESTRICTONS between First Ave. &amp; PA 363. 9 PM - 5 AM. - 7/9/09US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM ; WESTBOUND WEEKENDS 7 PM - 2 PM. (Westbound restrictions starting in late summer.) - 5/26/09-7/2010</description><pubDate>7/6/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF JUNE 29 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-JUNE-29-CONSTRUCTION-REPORT-nwMFT_66.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-JUNE-29-CONSTRUCTION-REPORT-nwMFT_66.aspx</guid><description>US 422 East, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. Weekdays 10 AM - 5 AM. - 6/29/09-7/2/09US 422 East, Upper Merion, West Norriton twps. - Bridge Construction: LANE RESTRICTIONS between PA 363 &amp; PA 23. 10 PM - 5 AM. - 6/30/09US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM ; WESTBOUND WEEKENDS 7 PM - 2 PM. (Westbound restrictions starting in late summer.) - 5/26/09-7/2010</description><pubDate>6/30/2009 12:00:00 AM</pubDate></item><item><title>LANE CLOSURES CONTINUE ON EASTBOUND US 422 FOR ROADWORK BETWEEN ROYERSFORD AND COLLEGEVILLE INTERCHANGES IN MONTGOMERY CO. </title><link>http://www.422improvements.com/News/LANE-CLOSURES-CONTINUE-ON-EASTBOUND-US-422-FOR-ROADWORK-BETWEEN-ROYERSFORD-AND-COLLEGEVILLE-INTERCHANGES-IN-MONTGOMERY-CO.--nwMFT_67.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/LANE-CLOSURES-CONTINUE-ON-EASTBOUND-US-422-FOR-ROADWORK-BETWEEN-ROYERSFORD-AND-COLLEGEVILLE-INTERCHANGES-IN-MONTGOMERY-CO.--nwMFT_67.aspx</guid><description>KING OF PRUSSIA, PA – Motorists traveling east on Route 422 in Montgomery County will continue to face a single-lane traffic pattern between the Royersford and Route 29 (Collegeville) interchanges as crews replace portions of the deteriorated concrete pavement, the Pennsylvania Department of Transportation (PennDOT) said today.
Eastbound Route 422 will be reduced from two lanes to one Monday through Thursday (June 29-July 2) from 10 a.m. to 5 a.m. the next morning.  Following the Independence Day holiday weekend, the eastbound lane closure will be in effect Monday, July 6 through Friday, July 10 from 10 a.m. to 5 a.m. the next morning.  PennDOT advises Route 422 drivers to allow additional time for travel through the construction zone.    
PennDOT’s contractor is rehabilitating and improving this deteriorated 4.5-mile section of Route 422 under a $12.2 million project that is financed by the American Recovery and Reinvestment Act (ARRA).  The project extends from 1,500 feet west of the Royersford Interchange to a half-mile east of the Route 29 (Collegeville) Interchange in Limerick and Upper Providence townships, respectively.  Work began on May 26, 2009 and will finish in July 2010.
The improvement project consists of removing deteriorated concrete pavement; pouring new concrete patches; resurfacing the concrete pavement with asphalt; repairing 12 bridges; repairing ramps at the Route 29 and Royersford interchanges; installing safety rumble strips on roadway shoulders; cleaning existing pipe culverts; and installing new guide rail, reflective pavement markers, and Intelligent Transportation System conduit.
PennDOT expects the concrete replacement work to shift to Route 422’s westbound lanes in August or September, and then westbound motorists will encounter a single-lane pattern weekdays from 7 p.m. to 2 p.m. the next afternoon.
Route 422 carries 62,000 vehicles a day between the Collegeville and Royersford exits.  This portion of the highway, which was built in the early 1970s, has four 12-foot wide travel lanes plus a 10-foot wide outside shoulder and an eight-foot wide inside shoulder.
Road-Con, Inc. of West Chester, Pa. is the general contractor on the $12,217,790 project.  Eight sub-contractors are part of the project team and are performing various operations, including paving, traffic control, line painting, concrete saw cutting, pipe cleaning, guide rail and fence installation; rumble strip installations; and seeding and erosion control.
In the five-county Philadelphia region, PennDOT is investing $257.7 million of federal economic recovery money on 22 state and local transportation projects that will improve roads and bridges, install Intelligent Transportation System equipment, upgrade traffic signals, build a multi-use trail, and bring over 3,500 handicap curb ramps up to current design standards.  
To learn more about how the federal economic recovery program will benefit Pennsylvania, visit recovery.org</description><pubDate>6/30/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF JUNE 22 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-JUNE-22-CONSTRUCTION-REPORT-nwMFT_65.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-JUNE-22-CONSTRUCTION-REPORT-nwMFT_65.aspx</guid><description>US 422 East, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 10 AM - 10 AM. - 6/19/09US 422 East, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 10 AM 5 AM. - 6/22/09-6/26/09US 422 East, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. Weekdays 10 AM - 5 AM. - 6/22/09-6/26/09US 422 East, Upper Pottsgrove Twp. - Bridge Inspection: RIGHT LANE CLOSED between Armand Hammer Blvd. &amp; Ridge Pike (Sanatoga Exit) interchanges. 9 AM - 3 PM. - 6/23/09US 422 E &amp; W, West Pottsgrove Twp. - Bridge Inspection: RIGHT LANE CLOSED between US 100 &amp; PA 663 interchanges. 9 AM - 3 PM. - 6/24/09US 422 East, Upper Merion, West Norriton twps. - Line Striping: LANE RESTRICTIONS between First Ave. &amp; PA 363. 10 PM - 5 AM. - 6/25/09US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM ; WESTBOUND WEEKENDS 7 PM - 2 PM. (Westbound restrictions starting in late summer.) - 5/26/09-7/2010</description><pubDate>6/22/2009 12:00:00 AM</pubDate></item><item><title>DVRPC to host Public Open House Meetings for US 422 Master Plan</title><link>http://www.422improvements.com/News/DVRPC-to-host-Public-Open-House-Meetings-for-US-422-Master-Plan-nwMFT_64.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/DVRPC-to-host-Public-Open-House-Meetings-for-US-422-Master-Plan-nwMFT_64.aspx</guid><description>The Delaware Valley Regional Planning Commission is hosting public open house meetings in support of their US 422 Multi-Modal Master Plan. These meetings will be held:
June 23, 2009 – 6:30 to 9:30 p.m. – Pottstown Middle School
June 24, 2009 – 6:30 to 9:30 p.m. – Spring Ford High School
For more information about these open houses, visit http://www.422corridor.com/</description><pubDate>6/19/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF JUNE 15  2009 CONSTRUCTION </title><link>http://www.422improvements.com/News/WEEK-OF-JUNE-15--2009-CONSTRUCTION--nwMFT_63.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-JUNE-15--2009-CONSTRUCTION--nwMFT_63.aspx</guid><description>US 422 West, Lower Pottsgrove, North Coventry twps. - Bridge Repair: RIGHT LANE CLOSED between Armand Hammer Blvd. &amp; PA 724. 8 PM - 5 AM. - 6/15/09-6/18/09US 422 East, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. Weekdays 10 AM - 5 AM. - 6/15/09-6/19/09US 422 West, Upper Merion, West Norriton twps. - Installing Lights on Sign: LANE RESTRICTIONS between First Ave. &amp; PA 23. 10 PM - 5 AM. - 6/17/09US 422 East, Upper Merion, West Norriton twps. - Line Striping: LANE RESTRICTIONS between First Ave. &amp; PA 363. 10 PM - 5 AM. - 6/18/09US 422 East, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 5 AM - 10 AM. - 6/20/09US 422 East, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. 5 AM - 10 AM. - 6/20/09US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM ; WESTBOUND WEEKENDS 7 PM - 2 PM. (Westbound restrictions starting in late summer.) - 5/26/09-7/2010</description><pubDate>6/15/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF JUNE 8 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-JUNE-8-CONSTRUCTION-REPORT-nwMFT_62.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-JUNE-8-CONSTRUCTION-REPORT-nwMFT_62.aspx</guid><description>US 422 East, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. Weekdays 10 AM - 5 AM. - 6/8/09-6/12/09US 422 West, Upper Merion, West Norriton twps. - Installing Lights on Sign: LANE RESTRICTIONS between First Ave. &amp; PA 23. 9 AM - 3 PM. - 6/11/09US 422 East, Upper Merion, West Norriton twps. - Line Striping: LANE RESTRICTIONS between First Ave. &amp; PA 363. 10 PM - 5 AM. - 6/11/09US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM ; WESTBOUND WEEKENDS 7 PM - 2 PM. (Westbound restrictions starting in late summer.) - 5/26/09-7/2010</description><pubDate>6/8/2009 12:00:00 AM</pubDate></item><item><title>Gov. Rendell Announces Pennsylvania Community Transportation Initiative Funding Awards</title><link>http://www.422improvements.com/News/Gov.-Rendell-Announces-Pennsylvania-Community-Transportation-Initiative-Funding-Awards-nwMFT_61.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Gov.-Rendell-Announces-Pennsylvania-Community-Transportation-Initiative-Funding-Awards-nwMFT_61.aspx</guid><description>The US 422 Corridor will see $1,999,649 of the $76,000,000 in the Pennsylvania Community Transportation Initiative.&#160; The awards are as follows:
•	Montgomery County will receive $1,775,000 to reduce the width of Hanover Street vehicle lanes in Pottstown and North Coventry Township in order to have room to install bike lanes, parking, and a multi-use trail from River Road to High Street
•	The Borough of Pottstown will receive $224,649 for sidewalk rehabilitation, update, and new signage and pavement markings.
View the attached press-release for more information.</description><pubDate>6/2/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF JUNE 1 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-JUNE-1-CONSTRUCTION-REPORT-nwMFT_60.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-JUNE-1-CONSTRUCTION-REPORT-nwMFT_60.aspx</guid><description>US 422 East, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. Weekdays 10 AM - 5 AM. - 6/1/09-6/5/09US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM ; WESTBOUND WEEKENDS 7 PM - 2 PM. (Westbound restrictions starting in late summer.) - 5/26/09-7/2010</description><pubDate>6/1/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF MAY 25 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-MAY-25-CONSTRUCTION-REPORT-nwMFT_59.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-MAY-25-CONSTRUCTION-REPORT-nwMFT_59.aspx</guid><description>US 422 East, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between Royersford &amp; PA 29 Interchanges. Weekdays 10 AM - 5 AM. - 5/26/09-5/30/09US 422 E &amp; W, Upper Providence, Limerick twps. - Road Reconstruction: REDUCED FROM TWO LANES TO ONE between PA 29 &amp; Royersford Interchange. EASTBOUND WEEKDAYS 10 AM - 5 PM ; WESTBOUND WEEKENDS 7 PM - 2 PM. (Westbound restricitons starting in late summer.) - 5/26/09-7/2010US 422 West, Upper Pottsgrove Twp. - Bridge Inspection: RIGHT LANE CLOSED between Ridge Pike &amp; Armand Hammer Blvd. Interchanges. 9 AM - 3 PM. - 5/28/09</description><pubDate>5/26/2009 12:00:00 AM</pubDate></item><item><title>PENNDOT TO START STIMULUS FUNDED  12.2 MILLION IMPROVEMENT OF ROUTE 422 IN MONTGOMERY COUNTY</title><link>http://www.422improvements.com/News/PENNDOT-TO-START-STIMULUS-FUNDED--12.2-MILLION-IMPROVEMENT-OF-ROUTE-422-IN-MONTGOMERY-COUNTY-nwMFT_57.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/PENNDOT-TO-START-STIMULUS-FUNDED--12.2-MILLION-IMPROVEMENT-OF-ROUTE-422-IN-MONTGOMERY-COUNTY-nwMFT_57.aspx</guid><description>KING OF PRUSSIA, PA – The Pennsylvania Department of Transportation (PennDOT) will start construction Tuesday (May 26) to rehabilitate and improve a deteriorated 4.5-mile section of Route 422 in Montgomery County under a $12.2 million project that is financed by the American Recovery and Reinvestment Act (ARRA).
“This multi-million dollar improvement of Route 422 would not be starting this year if it were not for the federal economic stimulus funds,” PennDOT District Executive Lester C. Toaso said.  “We are ready to upgrade this rough stretch of pavement and provide motorists with a smooth, structurally-sound roadway for many years to come.” 
Construction crews will rehabilitate Route 422 from a half-mile east of the Route 29 (Collegeville) Interchange to 1,500 feet west of the Royersford Interchange in Upper Providence and Limerick townships, respectively.  The project is scheduled to finish in July 2010.
Starting next week, crews will remove areas of deteriorated concrete pavement and pour new concrete patches on eastbound Route 422.  They also will resurface the concrete pavement with asphalt; repair 12 bridges; repair ramps at the Route 29 and Royersford interchanges; install 
safety rumble strips on roadway shoulders; clean existing pipe culverts; and install new guide rail, reflective pavement markers, and Intelligent Transportation System conduit.
Route 422 drivers will face lane closures weekdays, weeknights and some weekends over the next year.  The contractor will stage the work so all lanes will be open on eastbound Route 422 during the peak morning commuting hours and all westbound lanes will be open during the peak late afternoon travel hours.  Weekend ramps closures will occur at the Route 29 and Royersford interchanges for repairs and resurfacing. 
Starting Tuesday (May 26) and lasting about three months, eastbound Route 422 will be reduced from two lanes to one on weekdays from 10 a.m. to 5 a.m. the next morning for the removal and replacement of deteriorated concrete pavement.  The contractor plans to start at the Royersford Interchange and proceed east.  
When the concrete replacement work shifts to Route 422’s westbound lanes in August or September, westbound motorists will encounter a signal-lane pattern weekdays from 7 p.m. to 2 p.m. the next afternoon.
Route 422 carries 62,000 vehicles a day between the Collegeville and Royersford exits.  This portion of the highway, which was built in the early 1970s, has four 12-foot wide travel lanes plus a 10-foot wide outside shoulder and an eight-foot wide inside shoulder.
Road-Con, Inc. of West Chester, Pa. is the general contractor on the $12,217,790 project.  Eight sub-contractors are part of the project team and will perform various operations, including paving, traffic control, line painting, concrete saw cutting, pipe cleaning, guide rail and fence installation; rumble strip installations; and seeding and erosion control.
In the five-county Philadelphia region, PennDOT is investing $257.7 million of federal economic recovery money on 21 state and local transportation projects that will improve roads and bridges, install Intelligent Transportation System equipment, upgrade traffic signals, build a multi-use trail, and bring over 3,500 handicap curb ramps up to current design standards.  
PennDOT has opened construction bids for six projects in southeastern Pennsylvania that are financed with ARRA federal funds.  Construction bid openings for the remaining 15 projects in the region will occur this month and in June, July and August.  
To learn more about how the federal economic stimulus will benefit Pennsylvania, visit www.recovery.pa.gov. </description><pubDate>5/21/2009 12:00:00 AM</pubDate></item><item><title>VALLEY FORGE NATIONAL HISTORICAL PARK ADDS NEW FREE SHUTTLE SERVICE </title><link>http://www.422improvements.com/News/VALLEY-FORGE-NATIONAL-HISTORICAL-PARK-ADDS-NEW-FREE-SHUTTLE-SERVICE--nwMFT_58.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/VALLEY-FORGE-NATIONAL-HISTORICAL-PARK-ADDS-NEW-FREE-SHUTTLE-SERVICE--nwMFT_58.aspx</guid><description>As traffic congestion, pollution, and driver frustration continue to grow on roads all around Valley Forge National Historical Park, the park is trying out a new way to keep the park quiet, safe, and green. This summer, the park is experimenting with a free shuttle among the most popular destinations to give visitors an alternative to driving. 
Visitors will now be able to park their cars and step on board The Revolutionary Shuttle. The six-mile loop runs throughout most of the park, and riders can hop on or off at any of nine stops, including the Welcome Center and Washington’s Headquarters. 
The colorful shuttles, wrapped with images of Continental soldiers, will come along every 15 to 20 minutes, so visitors can take their time at any destination without worrying about meeting a schedule. Partially fueled by bio-diesel, the shuttles will reduce congestion, noise, and emissions in the heart of the park. 
This Memorial Day weekend (May 23, 24 &amp; 25), shuttle service will be available for park visitors. Shuttle service will not be provided Tuesday, May 26 through Friday, May 29. Service will resume Saturday, May 30 and run seven days a week through August 30, 2009.
This year’s shuttle service is an experiment. Park staff will be on hand to reach out to visitors to find out what they do and don’t like about the service, and will tweak it throughout the summer to find the best fit. “The Revolutionary Shuttle is a great new addition to the growing menu of visitor services at Valley Forge,” said park superintendent Mike Caldwell. “We’re experimenting with the service this summer, and if visitors are enthusiastic we’ll expand it next year.” 
The Revolutionary Shuttle is the latest in a variety of fun, convenient ways to see the park. The popular 90-minute guided Trolley Tour already is running. Trolley Tour riders hear the full story of the Valley Forge Encampment and enjoy the expertise of a professional guide on an open-air trolley, with extended guided stops at Washington’s Headquarters and Muhlenberg’s Brigade. 
Visitors also can walk, bike, or ride horses on some of the park’s 26 miles of trails. Bike rentals are available at the Lower Welcome Center parking lot.
The shuttle is funded through National Park Service Alternative Transportation Funds, and a grant from the Ford Motor Company through the National Park Foundation. Greater Valley Forge Transportation is providing management services.</description><pubDate>5/21/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF MAY 18 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-MAY-18-CONSTRUCTION-REPORT-nwMFT_56.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-MAY-18-CONSTRUCTION-REPORT-nwMFT_56.aspx</guid><description>US 422 West, Upper Merion, West Norriton twps. - Line Striping: LANE RESTRICTIONS between PA 363 &amp; First Ave. 10 PM - 5 AM. - 5/18/09-5/19/08
</description><pubDate>5/18/2009 12:00:00 AM</pubDate></item><item><title>I 76 ROADWORK CONTINUES IN VALLEY FORGE AREA</title><link>http://www.422improvements.com/News/I-76-ROADWORK-CONTINUES-IN-VALLEY-FORGE-AREA-nwMFT_55.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/I-76-ROADWORK-CONTINUES-IN-VALLEY-FORGE-AREA-nwMFT_55.aspx</guid><description>The Pennsylvania Turnpike Commission is advising motorists traveling I-76 between the Valley Forge (Exit #326) and Downingtown (Exit #312) Interchanges to be prepared for overnight lane closures, Sunday, May 17, westbound 8 p.m. to 6 a.m. and eastbound  9 p.m. to 5 a.m., for construction work in the center lanes at milepost 324.  
The work is part of the Turnpike’s project to replace the Valley Forge Road Bridge (Route 252) that crosses over the Turnpike at milepost 324.3. The general contractor, Allan A. Myers, LLC, will continue work in this area until the new bridge is constructed and open to traffic in November. The contractor’s schedule is dependent on the weather and subject to change. 
Motorists are urged to stay alert for slow moving construction vehicles, stopped traffic, and lane closures. Posted speed limits will be enforced and fines doubled.Motorists are well advised to take extra care and not speed through road work sites. Under state law: Fines for driving violations in active work zones, marked by flashing lights, are doubled. Motorists traveling 11 mph or more over the posted speed limit can lose their driver's licenses for 15 days. Points assessed to motorists' driving records are doubled for work zone infractions. Some work zones have signs requiring motorists to turn on headlights.</description><pubDate>5/15/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF MAY 11 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-MAY-11-CONSTRUCTION-REPORT-nwMFT_54.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-MAY-11-CONSTRUCTION-REPORT-nwMFT_54.aspx</guid><description>US 422 West, Upper Merion, West Norriton twps. - Line Striping: LANE RESTRICTIONS between First Ave. &amp; PA 363. 10 PM - 5 AM. - 5/11/09-5/15/09US 422 East, Upper Providence Twp. - Joint Sealing: LANE RESTRICTIONS between PA 29 &amp; Oaks exit. 9 AM - 3 PM. - 5/11/09-5/15/09</description><pubDate>5/11/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF MAY 4 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-MAY-4-CONSTRUCTION-REPORT-nwMFT_53.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-MAY-4-CONSTRUCTION-REPORT-nwMFT_53.aspx</guid><description>US 422 East, Upper Providence Twp. - Joint Sealing: LANE RESTRICTIONS between PA 29 &amp; Oaks exit. 9 AM - 3 PM. - 5/4/09-5/5/09US 422 West, Upper Merion, West Norriton twps. - Line Striping: REDUCED FROM THREE LANES TO ONE between First Ave. &amp; PA 363. 10 PM - 5 AM. - 5/4/09-5/7/09US 422 East, Upper Pottsgrove Twp. - Bridge Inspection: RIGHT LANE CLOSED between Ridge Pike &amp; PA 724. 9 AM - 12 PM. - 5/6/09US 422 West, Upper Pottsgrove Twp. - Bridge Inspection: RIGHT LANE CLOSED between Ridge Pike &amp; PA 724. 12 PM - 3 PM. - 5/6/09US 422 East, Lower Pottsgrove Twp. - Bridge Inspection: RIGHT LANE CLOSED between PA 100 &amp; PA 663 Interchanges. 9 AM - 3 PM. - 5/7/09</description><pubDate>5/5/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF APRIL 27 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-APRIL-27-CONSTRUCTION-REPORT-nwMFT_52.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-APRIL-27-CONSTRUCTION-REPORT-nwMFT_52.aspx</guid><description>•	US 422 West, Upper Merion, West Norriton twps. - Milling &amp; Paving: REDUCED FROM THREE LANES TO ONE between First Ave. &amp; PA 363. 10 PM - 5 AM. - 4/27/09-4/29/09•	US 422 E &amp; W, Lower Pottsgrove, Limerick twps., Pottstown Bor. - Sweeping: LANE RESTRICTIONS between Sanatoga &amp; Stowe exits. 9 AM - 3 PM. - 4/27/09-4/30/09•	US 422 East, Lower Providence Twp. - Joint Sealing: LANE RESTRICTIONS between PA 29 &amp; Oaks exit. 9 Am - 3 PM. - 4/29/2009</description><pubDate>4/27/2009 12:00:00 AM</pubDate></item><item><title>OVERNIGHT LANE CLOSURES ON US 422 WEST FOR PAVING IN MONTGOMERY CO.</title><link>http://www.422improvements.com/News/OVERNIGHT-LANE-CLOSURES-ON-US-422-WEST-FOR-PAVING-IN-MONTGOMERY-CO.-nwMFT_51.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/OVERNIGHT-LANE-CLOSURES-ON-US-422-WEST-FOR-PAVING-IN-MONTGOMERY-CO.-nwMFT_51.aspx</guid><description>KING OF PRUSSIA, PA – Overnight lane closures are scheduled over the next week on westbound Route 422 between Route 23 and Route 363 in Upper Merion and West Norriton townships, Montgomery County, for resurfacing, the Pennsylvania Department of Transportation (PennDOT) today announced.
Westbound Route 422 will be reduced from two lanes to one from 9 p.m. to 6 a.m. during this operation, which also includes the resurfacing of two exit ramps.  The ramps will remain open to traffic during construction.   
Weather permitting, the contractor’s schedule is:
•	From 9 p.m. Friday (April 24) to 6 a.m. Saturday (April 25), crews will resurface the Route 422 West ramp to Route 23 and the Route 422 West ramp to Route 363.
•	From 9 p.m. Monday (April 27) to 6 a.m. Tuesday (April 28), crews will resurface westbound Route 422’s left lane.
•	From 9 p.m. Tuesday (April 28) to 6 a.m. Wednesday (April 29), crews will resurface westbound Route 422’s center lane.
•	From 9 p.m. Wednesday (April 29) to 6 a.m. Thursday (April 30), crews will resurface westbound Route 422’s right lane.
Motorists are advised to allow additional time when traveling west on Route 422 during this operation because backups may occur.  
This work is part of PennDOT’s $5.5 million project to improve travel and reduce congestion on westbound Route 422 by adding a third westbound lane between the Route 23 and Route 363 interchanges. 
Glasgow, Inc. of Glenside, Pa. is the general contractor on the $5,514,984 contract that is financed with 80 percent federal and 20 percent state funds.
For additional information on Route 422, visit www.422improvements.com.</description><pubDate>4/23/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF APRIL 20 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-APRIL-20-CONSTRUCTION-REPORT-nwMFT_50.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-APRIL-20-CONSTRUCTION-REPORT-nwMFT_50.aspx</guid><description>US 422 East, Lower Pottsgrove Twp. - Bridge Inspection: RIGHT LANE CLOSED between PA 724 &amp; Armand Hammer Blvd. 9 AM - 3 PM. - 4/20/09US 422 East, Lower Pottsgrove Twp. - Sweeping: LANE RESTRICTIONS between Sanatoga exit &amp; Berks County line. 9 AM - 3 PM. - 4/20/09-4/23/09US 422 West, Lower Pottsgrove Twp. - Bridge Inspection: RIGHT LANE CLOSED between PA 724 &amp; Armand Hammer Blvd. 9 AM - 3 PM. - 4/21/09US 422 East, Lower Pottsgrove Twp. - Bridge Inspection: RIGHT LANE CLOSED between PA 100 &amp; PA 663 interchanges. 9 AM - 3 PM. - 4/22/09US 422 West, Lower Pottsgrove Twp. - Bridge Inspection: RIGHT LANE CLOSED between PA 100 &amp; PA 663 interchanges. 9 AM - 3 PM. - 4/23/09US 422 West, Upper Merion, West Norriton twps. - Milling &amp; Paving: LANE RESTRICTIONS between PA 363 &amp; First Ave. 10 PM - 5 AM. - 4/25/09</description><pubDate>4/20/2009 12:00:00 AM</pubDate></item><item><title>Road Closure in Upper Providence Township</title><link>http://www.422improvements.com/News/Road-Closure-in-Upper-Providence-Township-nwMFT_48.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Road-Closure-in-Upper-Providence-Township-nwMFT_48.aspx</guid><description>Black Road Road in Upper Providence will see lane closures as the road is widened by  GlaxoSmithKline between Troutman Road and Route 29. The construction, which started Monday, April 13, will cause lane closures between 9 a.m. and 2 p.m. through June 12. GlaxoSmithKline is completing the work under a PennDOT Highway Occupancy Permit, according to PennDOT.
</description><pubDate>4/15/2009 12:00:00 AM</pubDate></item><item><title>Road Closure in Upper Providence Township</title><link>http://www.422improvements.com/News/Road-Closure-in-Upper-Providence-Township-nwMFT_49.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Road-Closure-in-Upper-Providence-Township-nwMFT_49.aspx</guid><description>Black Road Road in Upper Providence will see lane closures as the road is widened by  GlaxoSmithKline between Troutman Road and Route 29. The construction, which started Monday, April 13, will cause lane closures between 9 a.m. and 2 p.m. through June 12. GlaxoSmithKline is completing the work under a PennDOT Highway Occupancy Permit, according to PennDOT.
</description><pubDate>4/15/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF APRIL 13 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-APRIL-13-CONSTRUCTION-REPORT-nwMFT_47.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-APRIL-13-CONSTRUCTION-REPORT-nwMFT_47.aspx</guid><description>US 422 East, Lower Pottsgrove Twp. - Bridge Inspection: RIGHT LANE CLOSED between PA 724 &amp; Armand Hammer Blvd. 9 AM - 3 PM. - 4/14/09US 422 West, Lower Pottsgrove Twp. - Bridge Inspection: RIGHT LANE CLOSED between PA 724 &amp; Armand Hammer Blvd. 9 AM - 3 PM. - 4/15/09US 422 West, Upper Merion, West Norriton twps. - Milling &amp; Temporary Barrier Removal: LANE RESTRICTIONS between PA 363 &amp; First Ave. 10 PM - 5 AM. - 4/15/09-4/16/09US 422 East, Lower Pottsgrove Twp. - Sweeping: LANE RESTRICTIONS between Sanatoga exit &amp; Berks County line. 9 AM - 3 PM. - 4/16/09</description><pubDate>4/13/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF APRIL 6 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-APRIL-6-CONSTRUCTION-REPORT-nwMFT_45.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-APRIL-6-CONSTRUCTION-REPORT-nwMFT_45.aspx</guid><description>US 422 East, Upper Providence, Lower Providence twps. - Crack Sealing: LANE RESTRICTION between PA 29 &amp; PA 23. 9 AM - 3 PM. - 4/6/09-4/9/09US 422 East, Lower Pottsgrove Twp. - Sweeping: LANE RESTRICTIONS between Sanatoga exit &amp; Berks County line. 9 AM - 3 PM. - 4/6/09-4/9/09</description><pubDate>4/6/2009 12:00:00 AM</pubDate></item><item><title>PA 29 and Ridge Pike  Main St. Collegeville  Traffic Pattern Changes</title><link>http://www.422improvements.com/News/PA-29-and-Ridge-Pike--Main-St.-Collegeville--Traffic-Pattern-Changes-nwMFT_46.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/PA-29-and-Ridge-Pike--Main-St.-Collegeville--Traffic-Pattern-Changes-nwMFT_46.aspx</guid><description>The S.R. 0029, Section 0L1 project located in Collegeville Borough and Lower Providence Township recently switched from Stage 2 traffic patterns to Stage 3 traffic patterns.  As such, the lane configurations and traffic signal timings have recently been changed.  The lanes on westbound Ridge Pike and westbound Germantown Pike have been reduced from two lanes to one lane.  In conjunction, the travel lanes on the bridge carrying Ridge Pike over the Perkiomen Creek have been changed to one lane in the westbound direction (entering Collegeville Borough) and two lanes eastbound (exiting Collegeville Borough).  
Stage 3 construction will involve the placement of storm drainage, curbing and sidewalk on the south side of Ridge Pike between 2nd Avenue and the bridge and along 2nd Avenue from Ridge Pike to Chestnut Street.  
Stage 4 construction will involve the placement of concrete medians along 2nd Avenue from Ridge Pike to Chestnut Street, the installation of the final traffic signal equipment, the installation of landscaping items, and the placement of final paving, paint markings and signing. See Map</description><pubDate>4/6/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF MARCH 30 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-MARCH-30-CONSTRUCTION-REPORT-nwMFT_44.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-MARCH-30-CONSTRUCTION-REPORT-nwMFT_44.aspx</guid><description>US 422 East, Upper Providence, Lower Providence twps. - Crack Sealing: LANE RESTRICTION between PA 29 &amp; PA 23. 9 AM - 3 PM. - 3/30/09-4/2/09US 422 West, Lower Pottsgrove Twp. - Sweeping: LANE RESTRICTIONS between Sanatoga exit &amp; Berks County line. 9 AM - 3 PM. - 3/30/09-4/2/09</description><pubDate>3/30/2009 12:00:00 AM</pubDate></item><item><title>PA Turnpike Announces Change in Plan to Chester County Widening Project</title><link>http://www.422improvements.com/News/PA-Turnpike-Announces-Change-in-Plan-to-Chester-County-Widening-Project-nwMFT_43.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/PA-Turnpike-Announces-Change-in-Plan-to-Chester-County-Widening-Project-nwMFT_43.aspx</guid><description>The Pennsylvania Turnpike Commission has suspended further development of the Milepost 320 to 326 Total Reconstruction and Widening Project located in Tredyffrin and Upper Merion Townships, Chester and Montgomery Counties.  Please read the attached letter for more information.
</description><pubDate>3/25/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF MARCH 23 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-MARCH-23-CONSTRUCTION-REPORT-nwMFT_42.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-MARCH-23-CONSTRUCTION-REPORT-nwMFT_42.aspx</guid><description>US 422 West, Upper Merion, West Norriton twps. - Road Work: LANE RESTRICTIONS between First Ave. &amp; PA 363. 10 PM - 5 AM. - 3/25/09-3/26/09
</description><pubDate>3/23/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF MARCH 9 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-MARCH-9-CONSTRUCTION-REPORT-nwMFT_41.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-MARCH-9-CONSTRUCTION-REPORT-nwMFT_41.aspx</guid><description>US 422 West, Upper Merion, West Norriton twps. - Road Work: LANE RESTRICTION between First Ave. &amp; PA 363. 10 PM - 5 AM. - 3/11/09
</description><pubDate>3/10/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF MARCH 2 CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-MARCH-2-CONSTRUCTION-REPORT-nwMFT_40.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-MARCH-2-CONSTRUCTION-REPORT-nwMFT_40.aspx</guid><description>There are no reported issues.</description><pubDate>3/3/2009 12:00:00 AM</pubDate></item><item><title>Stimulus  Bridge to Somewhere</title><link>http://www.422improvements.com/News/Stimulus--Bridge-to-Somewhere-nwMFT_39.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Stimulus--Bridge-to-Somewhere-nwMFT_39.aspx</guid><description>By KEITH PHUCAS
Times Herald Staff
COURTHOUSE — Montgomery County is slated to receive $68.5 million for highways and bridges from the federal stimulus bill this year.
This is the county’s share of a $275.75 million funding pie divided up in Southeastern Pennsylvania, according to county officials. The Delaware Valley Regional Planning Commission (DVRPC) voted on the project funding Wednesday in Philadelphia.Read the whole story...</description><pubDate>2/27/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF FEB 23. CONSTRUCTION UPDATE</title><link>http://www.422improvements.com/News/WEEK-OF-FEB-23.-CONSTRUCTION-UPDATE-nwMFT_38.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-FEB-23.-CONSTRUCTION-UPDATE-nwMFT_38.aspx</guid><description>US 422 West, Upper Providence Twp. - Crack Sealing: LANE RESTRICTIONS between PA 363 &amp; PA 29. 9 AM - 3 PM. - 2/24/09-2/26/09
</description><pubDate>2/23/2009 12:00:00 AM</pubDate></item><item><title>PA TURNPIKE COMMISSION TO CLOSE ROUTE 252 IN TREDYFFRIN TOWNSHIP FOR BRIDGE REPLACEMENT</title><link>http://www.422improvements.com/News/PA-TURNPIKE-COMMISSION-TO-CLOSE-ROUTE-252-IN-TREDYFFRIN-TOWNSHIP-FOR-BRIDGE-REPLACEMENT-nwMFT_37.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/PA-TURNPIKE-COMMISSION-TO-CLOSE-ROUTE-252-IN-TREDYFFRIN-TOWNSHIP-FOR-BRIDGE-REPLACEMENT-nwMFT_37.aspx</guid><description>KING OF PRUSSIA - The Pennsylvania Turnpike Commission will close Route 252 (Valley Forge Road) between Adams Drive and Yellow Springs Road in Tredyffrin Township, Chester County, beginning Monday, March 2, for the replacement of the Route 252 Bridge over the Turnpike, the Pennsylvania Department of Transportation (PennDOT) today announced.
During construction, the Pennsylvania Turnpike Commission will detour Route 252 (Valley Forge&#160; Road) through traffic over Route 202, Route 422, and Route 23 (Port Kennedy Road).  Local access will be maintained up the construction zone.  Motorists are advised to allow extra time when traveling through the area.
The Pennsylvania Turnpike Commission will perform the work under a PennDOT Highway Occupancy Permit.  The new bridge is expected to open in early November.</description><pubDate>2/20/2009 12:00:00 AM</pubDate></item><item><title>WEEK of FEB 16 CONSTRUCTION UPDATE</title><link>http://www.422improvements.com/News/WEEK-of-FEB-16-CONSTRUCTION-UPDATE-nwMFT_36.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-of-FEB-16-CONSTRUCTION-UPDATE-nwMFT_36.aspx</guid><description>No reported issues</description><pubDate>2/17/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF FEB 9. CONSTRUCTION UPDATE</title><link>http://www.422improvements.com/News/WEEK-OF-FEB-9.-CONSTRUCTION-UPDATE-nwMFT_35.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-FEB-9.-CONSTRUCTION-UPDATE-nwMFT_35.aspx</guid><description>US 422 West, Upper Providence, Lower Providence twps. - Crack Sealing: LANE RESTRICTIONS between PA 363 &amp; Royersford Interchange. 9 AM - 3 PM. - 2/10/09-2/12/09
</description><pubDate>2/9/2009 12:00:00 AM</pubDate></item><item><title>Public Open House Scheduled for the US 422 Transportation Master Plan</title><link>http://www.422improvements.com/News/Public-Open-House-Scheduled-for-the-US-422-Transportation-Master-Plan-nwMFT_34.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Public-Open-House-Scheduled-for-the-US-422-Transportation-Master-Plan-nwMFT_34.aspx</guid><description>The Delaware Valley Regional Planning Commission has scheduled 2 public open house meetings to provide residents, commuters, employees, and any one else interested in the US 422 Transportation Master Plan an opportunity view plan documents, and discuss the concepts with the consultants conducting the plan.
Two dates have been scheduled for mid- February:Oaks Elementary School Cafeteria. February 17, 2009. 6:30 PM - 9:00 PM. (Snow Date: March 4th.)Montgomery County Community College, Pottstown Campus: Community Room. February 18, 2009. 6:30 PM - 9:00 PM. (Snow Date: February 26th.)
Please see the attached flyer for more information.</description><pubDate>2/4/2009 12:00:00 AM</pubDate></item><item><title>BRIDGE BEAM DELIVERIES TO RESULT IN  POSSIBLE TRAFFIC SLOWDOWNS IN PHOENIXVILLE </title><link>http://www.422improvements.com/News/BRIDGE-BEAM-DELIVERIES-TO-RESULT-IN--POSSIBLE-TRAFFIC-SLOWDOWNS-IN-PHOENIXVILLE--nwMFT_33.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/BRIDGE-BEAM-DELIVERIES-TO-RESULT-IN--POSSIBLE-TRAFFIC-SLOWDOWNS-IN-PHOENIXVILLE--nwMFT_33.aspx</guid><description>KING OF PRUSSIA, PA – Traffic slowdowns may occur in Phoenixville Borough, Chester County, during the next few weeks for the delivery of large steel beams for the new Gay Street/Route 113 Bridge that is under construction, the Pennsylvania Department of Transportation today announced.
Motorists can expect to face slower than normal travel speeds when large flat-bed trucks move through Phoenixville to deliver steel beams to the construction staging area.
Weather permitting, three trucks are scheduled to enter the borough on Wednesday and Thursday (Jan. 28-29) between 11 a.m. and 3 p.m.  Each truck will carry a 140-foot long steel beam.  On Friday (Jan. 30), six trucks will deliver six 80-foot long steel beams to the bridge site between 11 a.m. and 3 p.m.
The trucks will depart from Lancaster and arrive in the borough on westbound Route 23, then turn right onto Main Street and follow Main Street to the construction area.  Restrictions also will be in place on Vanderslice Street between Main Street and Franklin Street.   
Next week, PennDOT said 14 trucks are scheduled to arrive in Phoenixville on Monday through Thursday (Feb. 2-5) to deliver seven 120-foot long steel beams and seven 80-foot long steel beams. These trucks will enter the borough on Route 113.  
PennDOT said the $17.5 million dollar project to build the new nine-span Gay Street/Route 113 Bridge is running on schedule.  Crews have built the sub-structure support system that consists of eight new reinforced concrete piers and two reinforced concrete abutments, and they will set the new steel beams in place shortly after delivery.
The new bridge is scheduled to open in early 2010.
PennDOT began construction last April to remove and replace the 84-year-old Gay Street/Route 113 Bridge that spanned French Creek, several local streets, railroad tracks and the former Phoenix Steel site.
The new Gay Street/Route 113 Bridge will span 972 feet from end-to-end.  The bridge’s concrete deck will be supported by steel beams on the three southern and two northern approach spans, and by steel arches on the four central spans 
Construction crews are building the new bridge on the same alignment as the existing structure.  The new bridge will have two 12-foot wide travel lanes; two 6-foot wide shoulders; two 6-foot wide sidewalks; and ornamental street lights.     
Nyleve Bridge Corporation of Emmaus, Pa. is the general contractor on the $17,537,681 project.   The project is financed with 80 percent federal and 20 percent state funds.
Approximately 6,700 vehicles a day traveled over the Gay Street Bridge prior to its closure.</description><pubDate>1/28/2009 12:00:00 AM</pubDate></item><item><title>LANE CLOSURE FRIDAY ON ROUTE 422 WEST TO PAINT TRAFFIC LINES AND OPEN THIRD LANE BETWEEN ROUTES 23 AND ROUTE 363 IN MONTGOMERY CO. </title><link>http://www.422improvements.com/News/LANE-CLOSURE-FRIDAY-ON-ROUTE-422-WEST-TO-PAINT-TRAFFIC-LINES-AND-OPEN-THIRD-LANE-BETWEEN-ROUTES-23-AND-ROUTE-363-IN-MONTGOMERY-CO.--nwMFT_32.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/LANE-CLOSURE-FRIDAY-ON-ROUTE-422-WEST-TO-PAINT-TRAFFIC-LINES-AND-OPEN-THIRD-LANE-BETWEEN-ROUTES-23-AND-ROUTE-363-IN-MONTGOMERY-CO.--nwMFT_32.aspx</guid><description>KING OF PRUSSIA, PA – The Pennsylvania Department of Transportation (PennDOT) today announced that westbound Route 422 will be reduced from two lanes to one lane between Route 23 and Route 363 in Upper Merion and West Norriton townships, Montgomery County, on Friday (Jan. 23) from 9 a.m. to 2 p.m. to restripe the pavement and open a third westbound lane between the two interchanges.
Motorists are advised to allow additional time to travel west on Route 422 while crews remove existing pavement lines and paint new lines to establish the new three-lane pattern on westbound Route 422 between Route 23 and Route 363.
PennDOT District Executive Lester C. Toaso said the pavement striping operation is scheduled for Friday because no rain or snow is in the forecast and the daytime temperature is predicted to be above 40 degrees.
Upon completing the line painting operation, PennDOT will open the third westbound lane on this part of Route 422 as part of its $5.5 million project to reduce congestion on the westbound side of the highway during the weekday evening rush hour.
Glasgow, Inc. of Glenside, Pa. is the general contractor on the $5,514,984 contract that is financed with 80 percent federal and 20 percent state funds.</description><pubDate>1/21/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF JAN 19 CONSTRUCTION UPDATE</title><link>http://www.422improvements.com/News/WEEK-OF-JAN-19-CONSTRUCTION-UPDATE-nwMFT_31.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-JAN-19-CONSTRUCTION-UPDATE-nwMFT_31.aspx</guid><description>There are no reported issues.</description><pubDate>1/20/2009 12:00:00 AM</pubDate></item><item><title>US 422 Interim Project Update</title><link>http://www.422improvements.com/News/US-422-Interim-Project-Update-nwMFT_30.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/US-422-Interim-Project-Update-nwMFT_30.aspx</guid><description>The US 422 River Crossing Complex Interim Project is in the final stages of completion; however, the last operation to remove existing traffic lines and paint final lane stripes on westbound US 422 has not been completed due to cold weather conditions.  The lane striping is required to open the additional third westbound lane on US 422 between Route 23 and Route 363 (Trooper Road), and the additional exit lane at Route 363 (Trooper Road).  PennDOT said the line painting requires ambient air temperatures of at least 40 degrees.  The striping will be completed when the temperature meets an acceptable level.  We appreciate your patience during this process as we work to improve US 422.
</description><pubDate>1/14/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF JAN. 12  2009 CONSTRUCTION UPDATE</title><link>http://www.422improvements.com/News/WEEK-OF-JAN.-12--2009-CONSTRUCTION-UPDATE-nwMFT_29.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-JAN.-12--2009-CONSTRUCTION-UPDATE-nwMFT_29.aspx</guid><description>No reported activity.</description><pubDate>1/12/2009 12:00:00 AM</pubDate></item><item><title>WEEK OF DEC. 15. CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-DEC.-15.-CONSTRUCTION-REPORT-nwMFT_28.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-DEC.-15.-CONSTRUCTION-REPORT-nwMFT_28.aspx</guid><description>US 422 West, Upper Merion, West Norriton Twps. - Sign Installation: LANE RESTRICTION between PA 363 &amp; First Ave. 10 PM - 5 AM. - 12/8/08US 422 West, Upper Merion, West Norriton Twps. - Line Striping: LANE RESTRICTION between PA 363 &amp; First Ave. 10 PM - 5 AM. - 12/10/08-12/11/08</description><pubDate>12/15/2008 12:00:00 AM</pubDate></item><item><title>WEEK OF DEC 8. CONSTRUCTION REPORT</title><link>http://www.422improvements.com/News/WEEK-OF-DEC-8.-CONSTRUCTION-REPORT-nwMFT_26.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-DEC-8.-CONSTRUCTION-REPORT-nwMFT_26.aspx</guid><description>US 422 West, Upper Merion, West Norriton Twps. - Line Striping: LANE RESTRICTION between PA 363 &amp; First Ave. 10 PM - 5 AM. - 12/10/08-12/11/08
</description><pubDate>12/9/2008 12:00:00 AM</pubDate></item><item><title>PENNDOT TO OPEN NEW SPUR RAMP FROM  US 422 WEST TO PA 23 WEST IN UPPER MERION TOWNSHIP  </title><link>http://www.422improvements.com/News/PENNDOT-TO-OPEN-NEW-SPUR-RAMP-FROM--US-422-WEST-TO-PA-23-WEST-IN-UPPER-MERION-TOWNSHIP---nwMFT_27.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/PENNDOT-TO-OPEN-NEW-SPUR-RAMP-FROM--US-422-WEST-TO-PA-23-WEST-IN-UPPER-MERION-TOWNSHIP---nwMFT_27.aspx</guid><description>KING OF PRUSSIA, PA – The Pennsylvania Department of Transportation (PennDOT) today announced that early Wednesday morning (Dec. 10) it will open the newly built spur ramp to take Route 422 West drivers to Route 23 West in Upper Merion Township, Montgomery County.  The new spur was built off the existing Route 422 West ramp to Route 23 East. 
Weather permitting, PennDOT said its contractor will open the new spur ramp Wednesday (Dec. 10) before 6 a.m.   Crews will work from 9 p.m. Tuesday (Dec. 9) to 6 a.m. Wednesday (Dec. 10) to prepare to open the spur and motorists may face a lane closure on westbound Route 422 during this operation.  
Starting Wednesday, westbound Route 422 motorists destined for Route 23 West will use this exit ramp and spur to reach a signalized intersection at Route 23, where they will turn left to proceed west on Route 23.  In conjunction with opening the new ramp spur, PennDOT will close and remove the existing loop ramp from Route 422 West to Route 23 West.  
The opening of the spur ramp along westbound Route 422 is part of PennDOT’s $5.5 million project to reduce onerous congestion on westbound Route 422 during weekday evening rush hours by adding the third westbound lane between the Route 23 and Route 363 interchanges.  PennDOT expects to open the new third lane on westbound Route 422 within the next week.  Construction began last February and will finish in late December.  
Glasgow, Inc. of Glenside, Pa. is the general contractor on the $5,514,984 contract that is financed with 80 percent federal and 20 percent state funds.</description><pubDate>12/9/2008 12:00:00 AM</pubDate></item><item><title>Road Closure in Lower Providence Township</title><link>http://www.422improvements.com/News/Road-Closure-in-Lower-Providence-Township-nwMFT_25.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Road-Closure-in-Lower-Providence-Township-nwMFT_25.aspx</guid><description>Starting at 7:30 am on Wednesday, December 3rd through 5:00 pm on Friday, December 5th, Eagle Stream Drive will be closed to all traffic between Ridge Pike and Defford Place, due to road construction.
</description><pubDate>12/2/2008 12:00:00 AM</pubDate></item><item><title>WEEK OF DEC. 1 CONSTRUCTION UPDATE</title><link>http://www.422improvements.com/News/WEEK-OF-DEC.-1-CONSTRUCTION-UPDATE-nwMFT_24.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-DEC.-1-CONSTRUCTION-UPDATE-nwMFT_24.aspx</guid><description>US 422 E &amp; W, Several Municipalities - Rumble Strip Installation: SLOW MOVING OPERATION WITH TRAFFIC SHIFTS between Berks County line &amp; Porter Rd. 8:30 PM - 5 AM. - 11/24/08-11/25/08US 422 E &amp; W, Several Municipalities - Rumble Strip Installation: SLOW MOVING OPERATION WITH TRAFFIC SHIFTS between Berks County line &amp; Porter Rd. 8:30 PM - 5 AM. - 11/24/08-11/25/08US 422 E &amp; W, Lower Pottsgrove, Limerick, Upper Providence, Lower Providence twps. - Pothole Patching: SLOW MOVING OPERATION between Armand Hammer Blvd. &amp; PA 363. 9 AM - 3 PM. - 11/24/08-11/25/08US 422 E &amp; W, Upper Merion Twp. - Aerial Line Crossing: THREE SEPARATE 15-MINUTE STOPPAGES between Swedesford Rd. overpass &amp; PA 363. 12 AM - 5 AM. - 11/25/08US 422 West, Upper Merion, West Norriton Twps. - Road Work: LANE RESTRICTIONS between PA 363 &amp; First Ave. 8 PM - 5 AM. - 11/25/08</description><pubDate>12/1/2008 12:00:00 AM</pubDate></item><item><title>NOVEMBER 24 WEEKLY CONSTRUCTION UPDATE</title><link>http://www.422improvements.com/News/NOVEMBER-24-WEEKLY-CONSTRUCTION-UPDATE-nwMFT_23.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/NOVEMBER-24-WEEKLY-CONSTRUCTION-UPDATE-nwMFT_23.aspx</guid><description>US 422 E &amp; W, Several Municipalities - Rumble Strip Installation: SLOW MOVING OPERATION WITH TRAFFIC SHIFTS between Berks County line &amp; Porter Rd. 8:30 PM - 5 AM. - 11/24/08-11/25/08US 422 E &amp; W, Several Municipalities - Rumble Strip Installation: SLOW MOVING OPERATION WITH TRAFFIC SHIFTS between Berks County line &amp; Porter Rd. 8:30 PM - 5 AM. - 11/24/08-11/25/08US 422 E &amp; W, Lower Pottsgrove, Limerick, Upper Providence, Lower Providence twps. - Pothole Patching: SLOW MOVING OPERATION between Armand Hammer Blvd. &amp; PA 363. 9 AM - 3 PM. - 11/24/08-11/25/08US 422 E &amp; W, Upper Merion Twp. - Aerial Line Crossing: THREE SEPARATE 15-MINUTE STOPPAGES between Swedesford Rd. overpass &amp; PA 363. 12 AM - 5 AM. - 11/25/08US 422 West, Upper Merion, West Norriton Twps. - Road Work: LANE RESTRICTIONS between PA 363 &amp; First Ave. 8 PM - 5 AM. - 11/25/08</description><pubDate>11/24/2008 12:00:00 AM</pubDate></item><item><title>WEEK OF NOV 17 CONSTRUCTION UPDATE</title><link>http://www.422improvements.com/News/WEEK-OF-NOV-17-CONSTRUCTION-UPDATE-nwMFT_22.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-NOV-17-CONSTRUCTION-UPDATE-nwMFT_22.aspx</guid><description>US 422 East, Upper Merion, West Norriton Twps. - Road Work: LANE RESTRICTIONS between PA 363 &amp; First Ave. 10 PM - 5 AM. - 11/17/08
</description><pubDate>11/18/2008 12:00:00 AM</pubDate></item><item><title>NOVEMBER 10 WEEKLY CONSTRUCTION UPDATE</title><link>http://www.422improvements.com/News/NOVEMBER-10-WEEKLY-CONSTRUCTION-UPDATE-nwMFT_21.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/NOVEMBER-10-WEEKLY-CONSTRUCTION-UPDATE-nwMFT_21.aspx</guid><description>US 422 East, Upper Merion, West Norriton Twps. - Road Work: LANE RESTRICTIONS between PA 363 &amp; First Ave. 10 PM - 5 AM. - 11/10/08-11/11/08US 422 E &amp; W, West Pottsgrove, Lower Pottsgrove, North Coventry twps. - Rumble Strip Installation: LANE RESTRICTIONS between Berks County line &amp; Porter Rd. 8:30 PM - 5 AM. - 11/10/08-11/14/08US 422 East, Upper Merion, West Norriton twps.- Line Painting: SLOW MOVING OPERATION between PA 363 &amp; PA 23. 10 PM - 5 AM. - 11/12/08</description><pubDate>11/11/2008 12:00:00 AM</pubDate></item><item><title>November 3 WEEKLY CONSTRUCTION UPDATE</title><link>http://www.422improvements.com/News/November-3-WEEKLY-CONSTRUCTION-UPDATE-nwMFT_20.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/November-3-WEEKLY-CONSTRUCTION-UPDATE-nwMFT_20.aspx</guid><description>US 422 East, Upper Merion, West Norriton Twps. - Install Temporary Barrier: LANE RESTRICTIONS between PA 363 &amp; First Ave. 10 PM - 5 AM. - 11/3/08</description><pubDate>11/3/2008 12:00:00 AM</pubDate></item><item><title>OCT 27 Weekly Construction Update</title><link>http://www.422improvements.com/News/OCT-27-Weekly-Construction-Update-nwMFT_19.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/OCT-27-Weekly-Construction-Update-nwMFT_19.aspx</guid><description>US 422 East, Upper Merion, West Norriton Twps. - Sealing &amp; Line Painting: LANE RESTRICTIONS between PA 363 &amp; First Ave. 10 PM - 5 AM. - 10/27/08-10/30/08</description><pubDate>10/27/2008 12:00:00 AM</pubDate></item><item><title>WEEK OF OCT 20  2008 CONSTRUCTION UPDATE</title><link>http://www.422improvements.com/News/WEEK-OF-OCT-20--2008-CONSTRUCTION-UPDATE-nwMFT_17.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/WEEK-OF-OCT-20--2008-CONSTRUCTION-UPDATE-nwMFT_17.aspx</guid><description>US 422 East, Upper Merion, West Norriton Twps. - Paving: LANE RESTRICTIONS between PA 363 &amp; First Ave. 10 PM - 5 AM. - 10/23/08-10/24/08</description><pubDate>10/20/2008 12:00:00 AM</pubDate></item><item><title>LANE RESTRICTIONS ON RT 29 IN COLLEGEVILLE</title><link>http://www.422improvements.com/News/LANE-RESTRICTIONS-ON-RT-29-IN-COLLEGEVILLE-nwMFT_18.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/LANE-RESTRICTIONS-ON-RT-29-IN-COLLEGEVILLE-nwMFT_18.aspx</guid><description>Collegeville - Expect lane restrictions at the intersection of Ridge Pike and PA 29 in Collegeville from Oct 20th through Oct 31st.&#160; Lane restrictions will be in place between 9am and 3pm.&#160; Temporary traffic signals are being installed as part of the PA 29 realignment project.</description><pubDate>10/20/2008 12:00:00 AM</pubDate></item><item><title>OCT 7  2008 WEEKLY CONSTRUCTION UPDATE</title><link>http://www.422improvements.com/News/OCT-7--2008-WEEKLY-CONSTRUCTION-UPDATE-nwMFT_16.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/OCT-7--2008-WEEKLY-CONSTRUCTION-UPDATE-nwMFT_16.aspx</guid><description>US 422 West, West Pottsgrove, North Coventry, Lower Pottsgrove twps. - Milling &amp; Paving: LANE RESTRICTIONS between Berks County Line &amp; Porter Rd. 9 PM - 5 AM. - 10/6/08-10/10/08US 422 ramps at PA 100, North Coventry Twp. - Milling &amp; Paving: LANE RESTRICTIONS AND INTERMITTENT STOPPAGES ON RAMPS between Berks County line &amp; Porter Rd. 9 PM - 5 AM. - 10/6/08-10/10/08</description><pubDate>10/7/2008 12:00:00 AM</pubDate></item><item><title>Work to Resume on Route 29 in Collegeville</title><link>http://www.422improvements.com/News/Work-to-Resume-on-Route-29-in-Collegeville-nwMFT_15.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Work-to-Resume-on-Route-29-in-Collegeville-nwMFT_15.aspx</guid><description>Work will resume on Monday, October 6th in Collegeville at the intersection of Ridge Pike and PA Route 29 and continue through the week.&#160; Crews will be replacing the temporary traffic signals between the hours of 9 am and 3 pm.&#160; Expect minor traffic delays.</description><pubDate>10/3/2008 12:00:00 AM</pubDate></item><item><title>9 29 2008  Weekly Construction Update</title><link>http://www.422improvements.com/News/9-29-2008--Weekly-Construction-Update-nwMFT_14.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/9-29-2008--Weekly-Construction-Update-nwMFT_14.aspx</guid><description>US 422 E &amp; W, Upper Merion, West Norriton twps. - Road Work: LEFT LANE CLOSED between PA 363 &amp; First Ave. 10 PM - 5 AM. - 09/22/08US 422 West, Lower Providence, Upper Providence, Limerick twps. - Reflective Pavement Marker Installation: LEFT LANE CLOSED between Pawlings Rd. &amp; Sanatoga Rd. 10 PM - 5 AM. - 9/22/08-9/24/08US 422 E &amp; W, Upper Pottsgrove, Lower Pottsgrove, Limerick, Upper Providence, Lower Providence twps. - Bridge Deck Cleaning &amp; Sweeping: SLOW MOVING OPERATION between Chester county line &amp; PA 363. 9 AM - 3 PM. - 9/22/08-9/25/08US 422 West, West Pottsgrove, North Coventry, Lower Pottsgrove twps. - Milling &amp; Paving: LANE RESTRICTIONS between Berks County Line &amp; Porter Rd. 9 PM - 5 AM. - 9/22/08-9/26/08US 422 West, Upper Merion, West Norriton twps. - Lane Switch: LANE CLOSURES between PA 363 &amp; First Ave. 10 PM - 5 AM. - 9/23/08-9/24/08</description><pubDate>9/29/2008 12:00:00 AM</pubDate></item><item><title>Bridge Deck Cleaning  Week of Sep. 22  2008</title><link>http://www.422improvements.com/News/Bridge-Deck-Cleaning--Week-of-Sep.-22--2008-nwMFT_12.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Bridge-Deck-Cleaning--Week-of-Sep.-22--2008-nwMFT_12.aspx</guid><description>US 422 East &amp; West, Upper Pottsgrove, Lower Pottsgrove, Limerick, Upper Providence, Lower Providence twps. - Bridge Deck Cleaning &amp; Sweeping: SLOW MOVING OPERATION between Chester county line &amp; PA 363. 9 AM - 3 PM. - 9/22/08-9/25/08</description><pubDate>9/22/2008 12:00:00 AM</pubDate></item><item><title>Milling and Paving  Week of Sep. 22  2008</title><link>http://www.422improvements.com/News/Milling-and-Paving--Week-of-Sep.-22--2008-nwMFT_13.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Milling-and-Paving--Week-of-Sep.-22--2008-nwMFT_13.aspx</guid><description>US 422 West, West Pottsgrove, North Coventry, Lower Pottsgrove twps. - Milling &amp; Paving: LANE RESTRICTIONS between Berks County Line &amp; Porter Rd. 9 PM - 5 AM. - 9/22/08-9/26/08</description><pubDate>9/22/2008 12:00:00 AM</pubDate></item><item><title>US 422 OVERNIGHT LANE CLOSURES SCHEDULED IN KING OF PRUSSIA AREA TO CHANGE TRAFFIC PATTERN</title><link>http://www.422improvements.com/News/US-422-OVERNIGHT-LANE-CLOSURES-SCHEDULED-IN-KING-OF-PRUSSIA-AREA-TO-CHANGE-TRAFFIC-PATTERN-nwMFT_11.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/US-422-OVERNIGHT-LANE-CLOSURES-SCHEDULED-IN-KING-OF-PRUSSIA-AREA-TO-CHANGE-TRAFFIC-PATTERN-nwMFT_11.aspx</guid><description>KING OF PRUSSIA, PA - Overnight lane closures are scheduled next week (Sept. 22-24) on Route 422 between First Avenue and Route 363 in Upper Merion and West Norriton townships, Montgomery County, for a traffic pattern change, the Pennsylvania Department of Transportation (PennDOT) said today.
The contractor's work schedule is:
&#160;- From 10 p.m. Monday (Sept. 22) to 5 a.m. Tuesday (Sept. 23), Route 422's eastbound and westbound left lanes will be closed.
&#160;- From 10 p.m. Tues (Sept. 23) to 5 a.m. Wednesday (Sept. 24), Route 422's westbound left lane will be closed.
&#160;- From 10 p.m. Wednesday (Sept. 24) to 5 a.m. Thursday (Sept. 25), Route 422's westbound right lane will be closed.
Crews will work next week to relocate concrete barriers, paint traffic lines and pave part of the highway to shift two lanes of westbound traffic toward the center of the highway.&#160; Motorists are advised to allow extra time for travel on Route 422 during construction.&#160; This operation is part of PennDOT's $5.5 million project to reduce congestion on westbound Route 422 during weekday evening rush hours by adding a third westbound lane between the Route 23 and Route 363 interchanges.&#160; The project also includes repairs to the Route 422 bridge over the Schuylkill River.&#160; Construction is scheduled to finish in late November.</description><pubDate>9/19/2008 12:00:00 AM</pubDate></item><item><title>REFLECTIVE PAVEMENT MARKER INSTALLATION NEXT WEEK ON ROUTE 422 IN MONTCO AND ROUTE 309 IN BUCKS COUNTY</title><link>http://www.422improvements.com/News/REFLECTIVE-PAVEMENT-MARKER-INSTALLATION-NEXT-WEEK-ON-ROUTE-422-IN-MONTCO-AND-ROUTE-309-IN-BUCKS-COUNTY-nwMFT_10.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/REFLECTIVE-PAVEMENT-MARKER-INSTALLATION-NEXT-WEEK-ON-ROUTE-422-IN-MONTCO-AND-ROUTE-309-IN-BUCKS-COUNTY-nwMFT_10.aspx</guid><description>REFLECTIVE PAVEMENT MARKER INSTALLATION NEXT WEEK ON ROUTE 422 IN MONTCO AND ROUTE 309 IN BUCKS COUNTY09/11/2008-KING OF PRUSSIA: New reflective pavement markers will be installed next week on Route 422 in Montgomery County and Route 309 in Bucks County, the Pennsylvania Department of Transportation (PennDOT) today announced. The work is part of a $421,347 project to install reflective pavement markers on several state highways and ramps in the region.
Installation will begin 10 p.m. Monday (September 15). Work will be done during the overnight hours. The work crew will occupy one lane to conduct a slow-moving operation. Motorists are advised to be alert of this moving operation and to expect possible slowdowns when driving near the work crews. The operation is dependent on the weather.
The work schedule for next week is:Monday through Wednesday (September 15-17) from 10:00 p.m. to 5 a.m. 
Westbound Route 422 between the Route 363 (Trooper Rd.) and Sanatoga exits, in Lower Providence, Upper Providence and Limerick townships, Montgomery County.Thursday (September 18) from 9:00 p.m. to 5 a.m..
Route 309 (both directions) in Hilltown and West Rockhill townships, Bucks County.
On future dates over the next twelve months, the pavement markers will be installed on Interstate 95 and on Route 1 in lower Bucks County; on I-95, I-476 and routes 1 and 322 in Delaware County; and on I-95 in Philadelphia in the vicinity of Philadelphia International Airport.
PennDOT is installing the markers to improve visibility and safety for drivers at night and in bad weather such as rain or fog. They are installed along center lines, edge lines and ramps.
The markers more clearly define travel lanes and ramps, helping to prevent lane crossover. The devices supplement the reflective paint that is already used to designate highway lanes. Similar markers have been installed on many highways throughout Pennsylvania.
It only takes a minute or less to install each marker, so it is possible to install about 66 markers per hour depending on the location.
Each marker has a cast iron housing with a plastic reflector in the center. The devices measure 10 inches long by 5 &#189; inches wide, and weigh about 5 &#189; pounds each. Yellow reflectors are used for center lines, white reflectors are used for edge lines and two-color (red and white) reflectors are for exit and entrance ramps. The reflector is recessed below the surface of the housing and is designed to be snowplowable.
Earlier this year, crews installed the markers on Routes 30, 401, 113, 202 and 252 in Chester County, Route 3 and Route 30 in Delaware County and I-76 and Route 23 in Montgomery County.
D.W. Miller, Inc. of Huntingdon, Pa. is the contractor on the $421,347 project. The project is financed with federal and state funds.
For more information, visit www.dot.state.pa.us, and click on “PennDOT Near You&quot;</description><pubDate>9/12/2008 12:00:00 AM</pubDate></item><item><title>LANE RESTRICTIONS WEEK OF 9 8</title><link>http://www.422improvements.com/News/LANE-RESTRICTIONS-WEEK-OF-9-8-nwMFT_8.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/LANE-RESTRICTIONS-WEEK-OF-9-8-nwMFT_8.aspx</guid><description>US 422 West, Upper Providence Twp, - Base Repair: LEFT LANE CLOSED between Egypt Rd. &amp; PA 29. 9 AM - 3 PM. - 9/8/08-9/9/08US 422 West, West Pottsgrove, North Coventry, Lower Pottsgrove twps. - Paving: LANE RESTRICTIONS between Berks County Line &amp; Porter Rd. 9 PM - 5 AM. - 9/8/08-9/12/08US 422 East, Upper Providence Twp. - Base Repair: LEFT LANE CLOSED between PA 363 &amp; Egypt Rd. 9 AM - 3 PM. - 9/10/08-9/11/08</description><pubDate>9/8/2008 12:00:00 AM</pubDate></item><item><title>LANE RESTRICTIONS ON US 422 WEEK OF AUGUST 25  2008</title><link>http://www.422improvements.com/News/LANE-RESTRICTIONS-ON-US-422-WEEK-OF-AUGUST-25--2008-nwMFT_7.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/LANE-RESTRICTIONS-ON-US-422-WEEK-OF-AUGUST-25--2008-nwMFT_7.aspx</guid><description>US 422 E and W, N. Coventry, W. Pottsgrove, Lower Pottsgrove twps. - Milling and Paving: LANE RESTRICTIONS between Berks County line and Porter Rd. 9 PM - 5 AM. - 8/25/08-8/29/08</description><pubDate>8/25/2008 12:00:00 AM</pubDate></item><item><title>LANE RESTRICTIONS AND BRIEF TRAFFIC STOPPAGES ON ROUTE 422 THIS WEEK</title><link>http://www.422improvements.com/News/LANE-RESTRICTIONS-AND-BRIEF-TRAFFIC-STOPPAGES-ON-ROUTE-422-THIS-WEEK-nwMFT_5.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/LANE-RESTRICTIONS-AND-BRIEF-TRAFFIC-STOPPAGES-ON-ROUTE-422-THIS-WEEK-nwMFT_5.aspx</guid><description>KING OF PRUSSIA - The Pennsylvania Department of Transportation (PennDOT) today announced there will be lane closures and traffic stoppages on Route 422 next week (August 4-7) at the Egypt Road (Oaks) interchange in Upper Providence Township, Montgomery County, plus a closure and detour of the ramp from Egypt Road to westbound Route 422 on Monday (August 4).&#160; Motorists are advised to allow additional time to travel on Route 422 because backups may occur. Weather permitting, the work schedule is: Monday (August 4), from 9 a.m. to 3 p.m., the right lane will be closed on westbound Route 422 for removal of a deteriorated light pole.&#160; At approximately noon, there will be one 15-minute traffic stoppage on westbound Route 422.&#160; At the same time, there will be one 15-minute traffic stoppage on New Mill Road at Route 422.&#160; Monday (August 4), from 9 a.m. to 3 p.m., the ramp from Egypt Road to westbound Route 422 will be closed and detoured for removal of a deteriorated light pole.&#160; The detour route follows Black Rock Road and Route 29 to westbound Route 422.&#160; Tuesday and Wednesday (August 5-6), from 9 a.m. to 3 p.m., the right lane will be closed on eastbound Route 422 at the Egypt Road (Oaks) interchange for removal of deteriorated light poles.&#160; At approximately noon, there will be one 15-minute traffic stoppage on eastbound Route 422.&#160; At the same time, there will be one 15-minute traffic stoppage on the ramp from Egypt Road to eastbound Route 422.&#160; Thursday (August 7), from 9 a.m. to 3 p.m., the right lane will be closed on eastbound Route 422 at the Egypt Road (Oaks) interchange for removal of deteriorated light poles.&#160; At approximately noon, there will be one 15-minute traffic stoppage on eastbound Route 422 during this operation.&#160; 
PennDOT is removing a total of 12 high-mast steel light poles along Route 422 over the next two weeks due to their aged condition.&#160; The poles are about 30 years old.&#160; For more information and live views of PennDOT traffic cameras, visit us through the PennDOT Homepage at www.dot.state.pa.us and click on ‘Travel Information’.</description><pubDate>8/5/2008 12:00:00 AM</pubDate></item><item><title>LANE RESTRICTIONS AND BRIEF TRAFFIC STOPPAGE </title><link>http://www.422improvements.com/News/LANE-RESTRICTIONS-AND-BRIEF-TRAFFIC-STOPPAGE--nwMFT_4.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/LANE-RESTRICTIONS-AND-BRIEF-TRAFFIC-STOPPAGE--nwMFT_4.aspx</guid><description>KING OF PRUSSIA – The Pennsylvania Department of Transportation (PennDOT) today announced there will be a lane closure and a traffic stoppage on westbound Route 422 in Upper Providence Township, Montgomery County, plus a closure and detour of the ramp from Egypt Road to westbound Route 422 on Thursday (July 31). 
Motorists are advised to allow additional time to travel on Route 422 because backups may occur. Weather permitting, the work schedule is:Thursday (July 31), from 9 a.m. to 3 p.m., the right lane will be closed on westbound Route 422 for removal of deteriorated light poles.&#160; At approximately noon, there will be one 15-minute traffic stoppage on westbound Route 422 during this operation.&#160; At the same time, there will be one 15-minute traffic stoppage on New Mill Road at Route 422.Thursday (July 31), from 9 a.m. to 3 p.m., the ramp from Egypt Road to westbound Route 422 will be closed and detoured for removal of deteriorated light poles.&#160; The detour route follows Black Rock Road and Route 29 to westbound Route 422.PennDOT will be removing a total of 12 high-mast steel light poles along Route 422 due to their aged condition.&#160; The poles are about 30 years old.&#160; Two poles will be removed Thursday and the remainder will be removed during the next two weeks.For more information and live views of PennDOT traffic cameras, visit us through the PennDOT Homepage at www.dot.state.pa.us and click on ‘Travel Information’.</description><pubDate>7/30/2008 12:00:00 AM</pubDate></item><item><title>OVERNIGHT LANE CLOSURES THIS WEEK ON US 422</title><link>http://www.422improvements.com/News/OVERNIGHT-LANE-CLOSURES-THIS-WEEK-ON-US-422-nwMFT_3.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/OVERNIGHT-LANE-CLOSURES-THIS-WEEK-ON-US-422-nwMFT_3.aspx</guid><description>
KING OF PRUSSIA, PA – Eastbound and westbound Route 422 will be reduced from two lanes to one between the First Avenue and Route 363 interchanges in Upper Merion and West Norriton townships, Montgomery County, on Thursday and Friday (July 17-18) from 10 p.m. to 5 a.m. the next morning for median barrier installation, the Pennsylvania Department of Transportation (PennDOT) said today.Motorists are advised to allow extra time for travel on Route 422 during construction because backups may occur.&#160; This work is part of PennDOT’s $5.5 million project to reduce congestion on westbound Route 422 during weekday evening rush hours by adding a third westbound lane between the Route 23 and Route 363 interchanges.&#160; The project also includes repairs to the Route 422 bridge over the Schuylkill River. &#160;Construction is scheduled to finish in November. Glasgow, Inc. of Glenside, Pa. is the general contractor on the $5,514,984 contract that is financed with 80 percent federal and 20 percent state funds.</description><pubDate>7/14/2008 12:00:00 AM</pubDate></item><item><title>Fund bridge construction on the US 422 Schuylkill River Bridge</title><link>http://www.422improvements.com/News/Fund-bridge-construction-on-the-US-422-Schuylkill-River-Bridge-nwMFT_2.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Fund-bridge-construction-on-the-US-422-Schuylkill-River-Bridge-nwMFT_2.aspx</guid><description>2008 Congressman Joe Sestak announces a $750,000 appropriation to fund bridge construction on the US 422 Schuylkill River Bridge. </description><pubDate>3/8/2008 12:00:00 AM</pubDate></item><item><title>Construction begins on the US 422 Schuylkill River Bridge.</title><link>http://www.422improvements.com/News/Construction-begins-on-the-US-422-Schuylkill-River-Bridge.-nwMFT_1.aspx</link><guid isPermaLink="true">http://www.422improvements.com/News/Construction-begins-on-the-US-422-Schuylkill-River-Bridge.-nwMFT_1.aspx</guid><description>Over the next 10 months expect to see construction crews on the bridge during the night workings to improve your commute. For more information, see the Projects http://www.422improvements.com/422-improvements/projects.aspx</description><pubDate>2/2/2008 12:00:00 AM</pubDate></item></channel></rss>